BLD-Framing/Rough-in | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Mike Jordan
|
|
|
Framing and shear wall for hallway portion of permit only. Fixed stairs, repaired a scabbed rafter, fir-ed out studs to meet energy code/insulation. Want to get the hallway framing/shear okayed/documented so I can hang rock on garage side before I move on to basement portion. Thanks! First thing in AM if possible. Call ###-#### en route. Phone #: ###-#### Inspection requested via web by Kyle Bilinski. ok to rock exterior side of hallway wall. All repairs were made.
|
BLD-Conference | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | DONE |
Tell Riley
|
|
|
Initial meeting for basement and hall framing plan. Stair plan as well. Anytime after noon works, call Kyle en route. Thanks. Phone #: ###-#### Inspection requested via web by Kyle Bilinski
|
Routing Walk-In (BLD) | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/4/2019 | | 10/4/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/4/2019 | | DONE |
|
|
|
|
Application received | | 10/4/2019 | | | |
|
|
|
|