BLD-Final | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Mike Jordan
|
|
|
Blake Phone #: ###-####
|
DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Mike Jordan
|
|
|
CO installed.
|
BLD-Final | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | FAIL |
Mike Jordan
|
|
|
Blake Phone #: ###-####. Provide CO detector outside of bedroom.
|
BLD-Energy code compliance | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PASS |
Mike Jordan
|
|
|
Blake Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Mike Jordan
|
|
|
call for access- Blake Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/18/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 10/7/2019 | 10/7/2019 | 10/15/2019 | | PASS |
Josh Bogle
|
|
|
10/11 ADU, paper
|
Routing - PLAN CHECK | 10/14/2019 | | 10/15/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
ALL MET- NEED
APPLICATION SIGNED AND SCANNED IN
RCT expired on 9/5/19, needs to be updated before issuing the permits.
|
Telephone call | | | 10/15/2019 | | DONE |
|
|
|
Spoke with Blake to inform him the permit is ready, we need the application to be signed and that his RCT number is exipired. Once the RCt number is taken care of we can issue the permit.
|
Routing - MECHANICAL | 10/7/2019 | | 10/14/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/7/2019 | | 10/11/2019 | | PASS |
Karla Nelson
|
|
|
Existing structure encroaches into setbacks, this may remain as long as the building is not expanded. The ADU is only allowed to be 700 square feet. The storage area must remain unconditioned.
|
Routing - PUBLIC WORKS | 10/7/2019 | | 10/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Flood Plain | 10/9/2019 | | 10/10/2019 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Route to Impact Fee Review | 10/7/2019 | 10/10/2019 | 10/8/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 10/7/2019 | | 10/8/2019 | | PASS |
Doug Chausow
|
|
|
ADU Address: 11539 W Florida Dr
|
Route to Impact Fee Review | 10/7/2019 | 10/10/2019 | 10/7/2019 | | PASS |
Eric Bilimoria
|
|
|
|
Routing Walk-In (Zoning) | 10/7/2019 | 10/7/2019 | 10/7/2019 | A | FAIL |
Ethan Mansfield
|
|
|
just waiting for Recored deed restriction. All plans look good.
|
Routing Walk-In (BLD) | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Josh Bogle
|
|
|
took in as a level two and gave to permit Tech to route
|
Plans ACCEPTED BY PLAN TECH | | | 10/7/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/7/2019 | | DONE |
|
|
|
no plan check fee taken, 406
|
Application received | | 10/7/2019 | | | |
|
|
|
|