Zoning Approval | 2/19/2020 | 2/19/2020 | 2/19/2020 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Final | 2/12/2020 | 2/13/2020 | 2/14/2020 | P | PEND |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins needs mec finals and zoning final inside of house ok
|
BLD-Energy code compliance | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins
|
BLD-Framing/Rough-in | 12/6/2019 | 12/10/2019 | 12/10/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Dustin Collins
|
BLD-Framing/Rough-in | 12/5/2019 | 12/9/2019 | 12/6/2019 | A | CANC |
Dave Hannah
|
|
|
Our air seal is complete Phone #: ###-#### >> Inspection requested via web by Dustin Collins Inspection cancelled from web by: Dustin Collins
|
Routing Walk-In (BLD) | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | DONE |
Josh Bogle
|
|
|
plan mod
|
Routing - PLAN CHECK | 11/6/2019 | | 11/6/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/6/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2019 | | DONE |
Josh Bogle
|
|
|
FEE PER ADDED VALUE
|
Permit Ready to Issue | | | 11/6/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/6/2019 | | DONE |
|
|
|
plan mod approved
|
Routing Walk-In (Zoning) | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
KayCee Babb
|
|
|
All new windows to match style and grid lines as approved through DRH19-00463.
|
Routing Walk-In (BLD) | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | FAIL |
Josh Bogle
|
|
|
need engineering for lateral
|
Routing Walk-In (BLD) | 10/24/2019 | 10/24/2019 | 10/24/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/24/2019 | | 10/24/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/24/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 10/7/2019 | 10/7/2019 | 10/7/2019 | A | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Application received | | 10/7/2019 | | | |
|
|
|
|