Permit Information
Permit NumberBLD19-03999
StatusFinaled
Name SUNRISE DEVELOPMENT LLC
Site Address 4866 N CORRALERO LN
Project NameHackberry BLK 1 LOT 18
Customer Number 
ePlanReviewNo
Description
HILLSIDE, FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED-ROOFING TO BE INSTALLED AS PER MFG. SPECIFICATIONS TO MEET CLASS "A" REQUIREMENTS. ***FIRE SPRINKLERS REQUIRED*** Permit for the construction of a new 2869 sq. ft., two story (first story 2085 sq. ft., second story 784 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 645 sq. ft. of covered patio/porch and a 1046 sq. ft. attached garage per the approved plans and any notations. R-1ADA zoning and setbacks per planning. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Sprinklers are required. LGM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20207/17/20207/17/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by justin reynolds
DOC - Permit Finaled7/17/20207/17/20207/17/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/17/20207/17/20207/17/2020ADONE
DetailsBrandon Shaw
ACH50- 4.03
PubWorks Occupancy Approval7/16/20207/16/20207/16/2020 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance5/8/20205/11/20205/11/2020APASS
DetailsBrandon Shaw
Screened- Justin Phone #: ###-####
BLD-Energy code compliance5/8/20205/8/20205/8/2020PNR
DetailsTony Young
Screened- Justin Phone #: ###-####
BLD-Other5/7/20205/7/20205/7/2020PPASS
DetailsBrandon Shaw
Soffit inspection please Phone #: ###-#### Inspection requested via web by justin reynolds
BLD-Framing/Rough-in5/7/20205/7/20205/7/2020PPASS
DetailsBrandon Shaw
Engineering letter approving as built received by email, physical copy onsite...
BLD-Framing/Rough-in5/6/20205/6/20205/6/2020PFAIL
DetailsBrandon Shaw
Drag trusses, and drag straps to be as per plans, provide Engineering approval for as built or revised Engineering...
Install 6x6 per plans or Engineering approval for as built...
Per plans, interior shear walls to be blocked at edges...
OK to insulate...
BLD-Framing/Rough-in4/16/20204/17/20204/17/2020ANR
DetailsBrandon Shaw
Need to update permit and receive letter stating fire sprinklers are NOT required...
Routing - MECHANICAL4/3/2020 4/3/2020 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Framing/Rough-in3/30/20203/31/20203/31/2020ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by justin reynolds
BLD-Wall Bracing3/30/20203/31/20203/31/2020APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by justin reynolds
BLD-Foundation1/22/20201/23/20201/23/2020APART
DetailsTony Young
curt Phone #: ###-####// work in progress,, ok
BLD-Footing1/13/20201/17/20201/17/2020APASS
DetailsTony Young
curt Phone #: ###-####
PubWorks Subgrade Approval1/16/20201/16/20201/16/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  12/16/2019 DONE
OVERRIDE  12/13/2019  
Inspection Record Card- Bld  12/13/2019  
Permit Ready to Issue  12/13/2019 DONE
Plan assigned to (BJM)10/25/201910/25/201912/12/2019 DONE
DetailsBrian McGowan
12/13- 1st Review Completed- sfd L2 Paper
Case Summary (BLD)  12/12/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  12/12/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK12/11/2019 12/11/2019 PASS
DetailsBrian McGowan
Routing - FIRE12/9/201912/9/201912/9/2019 PASS
DetailsLee G Meredith
12-11-19 Applicant emailed to state they will be installing an NFPA 13D fire sprinkler system.
Plan resubmittals received  12/6/2019 DONE
2 sets of 19 large pages taken to Brian
Routing - MECHANICAL10/7/2019 12/4/2019 PASS
DetailsTroy James
Routing - PLANNING10/7/2019 12/3/2019 PASS
DetailsDavid Moser
cfh19-00097
Routing - PLAN CHECK10/7/2019 12/3/2019 FAIL
DetailsBrian McGowan
1st review completed  12/3/2019 DONE
Plan resubmittals received  11/25/2019 DONE
Two copies of approval letter for CFH18-00097 stamped and taken to plan reviewer.
Routing - FIRE10/7/201910/7/201911/15/2019 FAIL
DetailsLee G Meredith
10/24 - (404) 4866 N Corralero SFD, Paper

11-1-19 emailed applicant review comments and a list of deficiencies. Waiting for response. Sprinklers are required but not indicated on plans.

11-15-19 No response from applicant. Failed.
Routing - Erosion and Sediment10/30/2019 10/31/2019 PASS
DetailsAndy J. Long
ESC plan approved, needs field changes. Site preparation inspection is REQUIRED. Certified RP & PD listed.
Routing PW Grading-Hillside10/9/2019 10/30/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PUBLIC WORKS10/7/2019 10/30/2019 PASS
DetailsCandy A. Nichols
Plan Reviewer's activity  10/28/2019  
DetailsBrian McGowan
Spoke with Melissa, this Lot needs further review and clarification on Cat I or Cat II by Hillside due to the 4' difference in Grade from the Preliminary grading Plan and the approved Grading Plan.
Plan assigned to (J_N)10/7/201910/7/201910/25/2019 DEFR
DetailsJenny Nelson
10/24 sfd L2 ePlan
Route to Impact Fee Review10/7/201910/10/201910/8/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing10/7/2019 10/8/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  10/7/2019 DONE
Intake Approval  10/7/2019 PASS
Recd Pcfee & Taken To Pln CK  10/7/2019 DONE
Application received 10/7/2019