BLD-Final | 7/17/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
DOC - Permit Finaled | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 7/17/2020 | 7/17/2020 | 7/17/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.03
|
PubWorks Occupancy Approval | 7/16/2020 | 7/16/2020 | 7/16/2020 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 5/8/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Brandon Shaw
|
|
|
Screened- Justin Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | NR |
Tony Young
|
|
|
Screened- Justin Phone #: ###-####
|
BLD-Other | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Brandon Shaw
|
|
|
Soffit inspection please Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Brandon Shaw
|
|
|
Engineering letter approving as built received by email, physical copy onsite...
|
BLD-Framing/Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | FAIL |
Brandon Shaw
|
|
|
Drag trusses, and drag straps to be as per plans, provide Engineering approval for as built or revised Engineering... Install 6x6 per plans or Engineering approval for as built... Per plans, interior shear walls to be blocked at edges... OK to insulate...
|
BLD-Framing/Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | NR |
Brandon Shaw
|
|
|
Need to update permit and receive letter stating fire sprinklers are NOT required...
|
Routing - MECHANICAL | 4/3/2020 | | 4/3/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Wall Bracing | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by justin reynolds
|
BLD-Foundation | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Tony Young
|
|
|
curt Phone #: ###-####// work in progress,, ok
|
BLD-Footing | 1/13/2020 | 1/17/2020 | 1/17/2020 | A | PASS |
Tony Young
|
|
|
curt Phone #: ###-####
|
PubWorks Subgrade Approval | 1/16/2020 | 1/16/2020 | 1/16/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/16/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/13/2019 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/13/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 12/13/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 10/25/2019 | 10/25/2019 | 12/12/2019 | | DONE |
Brian McGowan
|
|
|
12/13- 1st Review Completed- sfd L2 Paper
|
Case Summary (BLD) | | | 12/12/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/11/2019 | | 12/11/2019 | | PASS |
Brian McGowan
|
|
|
|
Routing - FIRE | 12/9/2019 | 12/9/2019 | 12/9/2019 | | PASS |
Lee G Meredith
|
|
|
12-11-19 Applicant emailed to state they will be installing an NFPA 13D fire sprinkler system.
|
Plan resubmittals received | | | 12/6/2019 | | DONE |
|
|
|
2 sets of 19 large pages taken to Brian
|
Routing - MECHANICAL | 10/7/2019 | | 12/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/7/2019 | | 12/3/2019 | | PASS |
David Moser
|
|
|
cfh19-00097
|
Routing - PLAN CHECK | 10/7/2019 | | 12/3/2019 | | FAIL |
Brian McGowan
|
|
|
|
1st review completed | | | 12/3/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/25/2019 | | DONE |
|
|
|
Two copies of approval letter for CFH18-00097 stamped and taken to plan reviewer.
|
Routing - FIRE | 10/7/2019 | 10/7/2019 | 11/15/2019 | | FAIL |
Lee G Meredith
|
|
|
10/24 - (404) 4866 N Corralero SFD, Paper
11-1-19 emailed applicant review comments and a list of deficiencies. Waiting for response. Sprinklers are required but not indicated on plans.
11-15-19 No response from applicant. Failed.
|
Routing - Erosion and Sediment | 10/30/2019 | | 10/31/2019 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, needs field changes. Site preparation inspection is REQUIRED. Certified RP & PD listed.
|
Routing PW Grading-Hillside | 10/9/2019 | | 10/30/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 10/7/2019 | | 10/30/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Plan Reviewer's activity | | | 10/28/2019 | | |
Brian McGowan
|
|
|
Spoke with Melissa, this Lot needs further review and clarification on Cat I or Cat II by Hillside due to the 4' difference in Grade from the Preliminary grading Plan and the approved Grading Plan.
|
Plan assigned to (J_N) | 10/7/2019 | 10/7/2019 | 10/25/2019 | | DEFR |
Jenny Nelson
|
|
|
10/24 sfd L2 ePlan
|
Route to Impact Fee Review | 10/7/2019 | 10/10/2019 | 10/8/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 10/7/2019 | | 10/8/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/7/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/7/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/7/2019 | | DONE |
|
|
|
|
Application received | | 10/7/2019 | | | |
|
|
|
|