BLD-Wall Bracing | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PART |
Jim Storey
|
|
|
Ronald *screened* Phone #: ###-#### nailling ok// need hd at garage door// need fire septration.
|
BLD-Foundation | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PASS |
Dave Hannah
|
|
|
stem wall // Dustin Phone #: ###-####
|
BLD-Footing | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Jim Storey
|
|
|
Dustin Phone #: ###-####
|
Routing Walk-In (Zoning) | 11/29/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 11/29/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (JAB) Josh | 10/9/2019 | 10/9/2019 | 11/29/2019 | | PASS |
Josh Bogle
|
|
|
10/11 garage, paper - 1st done
|
Inspection Record Card- Bld | | | 11/29/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 11/29/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/29/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/29/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/9/2019 | | 10/9/2019 | | FAIL |
Josh Bogle
|
|
|
plans lack structural details - asked for engineering for lateral and ledger connections
|
1st review completed | | | 10/9/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Josh Bogle
|
|
|
Took in as a level two
|
Application received | | 10/7/2019 | | | |
|
|
|
|