BLD-Final | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
Permanent Occupancy | | | 1/31/2020 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete, signatures provide on permit sign off card.
Zach Phone #: ###-####
|
BLD-Final | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PART |
Dave Hannah
|
|
|
Zach Phone #: ###-#### ok for tco after fire oks for tco
|
FIRE-Final Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, per conversation with Ron Johson with Boise Fire, a 45 day TCO is authorized for occupancy, final sign off is contingent upon items noted on the 21NOV2019 inspection being completed, inspected and finaled.
|
FIRE-Final Inspection | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | FAIL |
Jim Page
|
|
|
Provide code compliant door hardware throughout space, current door hardware thoughout space is round type door hardware. Area of work requires fire alarm modifications, a seperate fire alarm permit will be required for area of work.
Zach Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | NR |
Dave Hannah
|
|
|
Zach Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/21/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/21/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 10/16/2019 | 10/19/2019 | 10/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (M_H) | 10/11/2019 | | 10/16/2019 | | DONE |
Michael Hanson
|
|
|
10/16 #518 L1 ePlan - Scott Tschigr - Suite #610
|
Routing - PLAN CHECK | 10/11/2019 | | 10/16/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 10/16/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 10/16/2019 | | DONE |
|
|
|
MET
Need GC
Need Rev Val
|
Routing - Addressing | 10/11/2019 | | 10/14/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/11/2019 | | 10/11/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW PLUMBING
|
Intake Approval | | | 10/10/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/9/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Per ePlan submittal standards the reserve the bottom right corner on the drawing plans for the City electronic stamps. Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block on plan sheet G1.2, A1.0, A4.0 see ePlan standards at https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
• It is unclear if the acoustic ceiling is new or existing, add note to plans if existing or add acoustic ceiling details if new.
|
Application received | | | 10/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 8 2019 10:43AM
|