Permit NumberBLD19-04031
StatusFinaled
Name PANORAMA CONSTRUCTION
Site Address 2211 S QUICKSILVER ST
Project Name2211 S Quicksilver
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 1093 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 48 sq. ft. of covered patio/porch and a 487 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1B zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results5/7/20205/7/20205/7/2020ADONE
DetailsTell Riley
5.56 ACH 50
BLD-Final5/6/20205/7/20205/7/2020APASS
DetailsTell Riley
Call for access Jeff Phone #: ###-####
DOC - Permit Finaled5/7/20205/7/20205/7/2020PPASS
DetailsTell Riley
BLD-Energy code compliance2/11/20202/12/20202/12/2020APASS
DetailsTell Riley
Jeff Phone #: ###-####
BLD-Framing/Rough-in2/6/20202/7/20202/7/2020APASS
DetailsTell Riley
Jeff Phone #: ###-####//ok to insulate//
BLD-Wall Bracing1/6/20201/6/20201/6/2020PPASS
DetailsTell Riley
JEFF Phone #: ###-####//nailing ok//need to add straps at portal frame inside of header--will check at framing//
BLD-Foundation1/6/20201/6/20201/6/2020PDEFR
DetailsTell Riley
no foundation inspection was scheduled//foundation was poured without inspection//contractor assumes all liability on foundation//
BLD-Footing12/16/201912/17/201912/17/2019APART
DetailsTell Riley
James Phone #: ###-####//WIP//setbacks ok//will heat bar prior to pour//blankets onsite--cold weather techniques discusses//
Telephone call  12/9/2019 DONE
sent a 3rd email to GC requesting the ESC permit
Issue PAID IN FULL permit  12/5/2019 DONE
Inspection Record Card- Bld  12/5/2019 DONE
Telephone call  12/5/2019 DONE
emailed the GC to request that the Erosion be sign and sent back
12/5/19 emailed permit to be sign to- jwmilich@msn.com
Eplan needs to be release
OVERRIDE  12/4/2019  
Permit Ready to Issue  12/4/2019 DONE
met
Plan assigned to (RDP)12/3/201912/3/201912/3/2019 DONE
DetailsRob Patrick
11/25 L1 SFD ePlan
Plan assigned to (BJM)11/12/201911/12/201912/3/2019 DEFR
DetailsBrian McGowan
11/25- L1 SFD ePlan
Routing - PLAN CHECK12/3/2019 12/3/2019 PASS
DetailsRob Patrick
1st review completed  12/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  12/3/2019 DONE
DetailsRob Patrick
Routing - Addressing11/12/2019 11/14/2019 PASS
DetailsDoug Chausow
Routing - MECHANICAL11/12/2019 11/14/2019 PASS
DetailsTroy James
Route to Impact Fee Review11/12/201911/15/201911/13/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - PLANNING11/12/2019 11/13/2019 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS11/12/2019 11/12/2019 PASS
DetailsCandy A. Nichols
Intake Approval  11/12/2019 PASS
Intake Approval  11/4/2019 FAIL
4th Prescreen- The ROS is final but you need to update the Manual J with the correct address.
Meeting  10/31/2019 DONE
David Moser informed me the ROS19-00021 has been completed and we are just waiting for the parcel to update as two.
Intake Approval  10/22/2019 FAIL
The ROS may have been recorded, but planning still needs documentation. Call David Moser at ###-####.

Intake Approval  10/21/2019 FAIL
This BLD cannot proceed through prescreen until the ROS case has been finaled. More documentation is required. Please contact David Moser at ###-####.
Intake Approval  10/10/2019 FAIL
ROS19-00021 needs to be completed before we can accept this building permit. If you have any questions about the record of survey please contact David Moser at ###-####
Application received  10/9/2019 DONE
Application submitted via PDS Online on Oct 9 2019 2:54PM