BLD-Energy code compliance | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | PASS |
Tony Young
|
|
|
Greg - call ahead Phone #: ###-####
|
BLD-Energy code compliance | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PART |
Tony Young
|
|
|
Greg Phone #: ###-####// seal pack ok
|
BLD-Framing/Rough-in | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PART |
Tony Young
|
|
|
Greg Phone #: ###-####,, needs truss bracing/ nailing,, ok to insulate,, noted soffits ok also
|
BLD-Wall Bracing | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PART |
Tony Young
|
|
|
Scott - Screened for COVID 19 Phone #: ###-####// exterior ok,, will have interior later
|
BLD-Wall Bracing | 4/10/2020 | 4/13/2020 | 4/13/2020 | A | NR |
Tony Young
|
|
|
Scott - Screened for COVID 19 Phone #: ###-####// need to re-do some areas
|
BLD-Wall Bracing | 4/10/2020 | 4/10/2020 | 4/10/2020 | P | NR |
Tony Young
|
|
|
Greg- screened for COVID 19 symptoms Phone #: ###-####// no one around,, no plans// re-call inspection
|
BLD-Foundation | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PART |
Tony Young
|
|
|
Pat Phone #: ###-####// late AM,, work in progress,, ok to pour when ready
|
BLD-Foundation | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | NR |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 2/28/2020 | 3/2/2020 | 3/2/2020 | A | PART |
Tony Young
|
|
|
Chris Phone #: ###-####,, footings are work in progress,, ok
|
BLD-Footing | 2/26/2020 | 2/27/2020 | 2/28/2020 | P | CANC |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 2/28/2020 | 2/28/2020 | 2/28/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 1/16/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/16/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 11/22/2019 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 11/15/2019 | 11/15/2019 | 11/22/2019 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 11/22/2019 | | 11/22/2019 | | FAIL |
Jenny Nelson
|
|
|
Corrections needed - soffit
|
Routing - PLAN CHECK | 11/22/2019 | | 11/22/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2019 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 11/22/2019 | | DONE |
|
|
|
ALL MET- Need RP
|
1st review completed | | | 11/18/2019 | | FAIL |
Debbie Sanine
|
|
|
Corrections Needed - Soffit Vents and ES report for Spray Foam
|
Routing - PLAN CHECK | 10/14/2019 | | 11/18/2019 | | FAIL |
Jenny Nelson
|
|
|
Per review with D_S, need foam spray ESR
|
Plan assigned to (RDP) | 10/14/2019 | 10/14/2019 | 11/15/2019 | | DEFR |
Rob Patrick
|
|
|
11/1 sfd L2 ePlan
|
Routing PW Grading-Hillside | 10/15/2019 | | 10/23/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 10/14/2019 | 10/17/2019 | 10/15/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 10/14/2019 | 10/14/2019 | 10/15/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Routing - MECHANICAL | 10/14/2019 | | 10/15/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 10/14/2019 | | 10/15/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Routing - Addressing | 10/14/2019 | | 10/15/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/14/2019 | | 10/15/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 10/14/2019 | | 10/15/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep required.
Plan designer has been listed as RP
|
Plans ACCEPTED BY PLAN TECH | | | 10/14/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/14/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/14/2019 | | DONE |
|
|
|
|
Application received | | | 10/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 11 2019 11:20AM
|