BLD-Final | 2/20/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Dave Hannah
|
|
|
Julie Phone #: ###-####
|
FIRE-Final Inspection | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Julie Phone #: ###-####
|
BLD-Other | 2/3/2020 | 2/5/2020 | 2/5/2020 | A | PART |
Dave Hannah
|
|
|
Inspection of structural steel and track installation for modular wall panels. Phone #: ###-#### Inspection requested via web by Julie Edgar beams and fire proofing ok
|
BLD-Framing/Rough-in | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Julie Edgar
|
Issue PAID IN FULL permit | | | 12/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/20/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
ALL MET NEED
GC FORM
REVISED VALUE
|
Plan assigned to (JG) | 10/18/2019 | 10/18/2019 | 11/14/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev, 10/30 L2 Boise Plaza
|
Routing - PLAN CHECK | 11/13/2019 | | 11/14/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 11/1/2019 | 11/4/2019 | 11/4/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 11/1/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 10/18/2019 | | 11/1/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 10/18/2019 | 10/18/2019 | 10/30/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. A permit will be required for any necessary modifications.
|
Intake Approval | | | 10/17/2019 | | PASS |
|
|
|
|
Application received | | | 10/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 11 2019 11:59AM
|