**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2327 sq. ft., two story (first story 872 sq. ft., second story 1455 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, 95 sq ft of covered patio and a 780 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/2/20207/2/20207/2/2020PPASS
DetailsBrandon Shaw
After 3 pm please Phone #: ###-#### Inspection requested via web by Daniel Appel
DOC - Permit Finaled7/2/20207/2/20207/2/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/2/20207/2/20207/2/2020PDONE
DetailsBrandon Shaw
ACH50- 2.93
BLD-Final7/1/20207/1/20207/1/2020PCANC
DetailsBrandon Shaw
After 3 pm please Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
BLD-Wall cover4/21/20204/22/20204/22/2020PPASS
DetailsBrandon Shaw
Insulation...
BLD-Framing/Rough-in4/21/20204/22/20204/22/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in4/16/20204/17/20204/17/2020AFAIL
DetailsBrandon Shaw
Address to be readily visible from the street...
Bedroom 3, first fl, egress window exceeds max height of 44", as is, 50"...
Provide straps at break in doulbe top plates- see red marks- bdrm 3 header & top of stairs...

OK to insulate...
BLD-Wall Bracing3/31/20204/1/20204/1/2020PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Wall Bracing3/25/20203/27/20203/27/2020PFAIL
DetailsTell Riley
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel//need to add hot dip galvanized nails at PT//nails shear panels marked in red//finish shear panels//add blocks where noted//told him to call back in//
BLD-Foundation3/3/20203/4/20203/4/2020APASS
DetailsBrandon Shaw
Chris Phone #: ###-####
BLD-Foundation3/2/20203/2/20203/2/2020PNR
DetailsBrandon Shaw
CHRIS- foundation wall Phone #: ###-####
BLD-Footing2/27/20202/28/20202/28/2020APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing2/26/20202/27/20202/27/2020PCANC
DetailsBrandon Shaw
Chris Phone #: ###-####
Issue PAID IN FULL permit  2/20/2020 DONE
Inspection Record Card- Bld  2/20/2020 DONE
OVERRIDE  11/15/2019  
Plan assigned to (J_N)11/15/201911/15/201911/15/2019 DONE
DetailsJenny Nelson
Plan assigned to (RDP)10/16/201910/16/201911/15/2019 DEFR
DetailsRob Patrick
10/29 sfd L1 ePlan
Routing - PLAN CHECK10/16/2019 11/15/2019 PASS
DetailsJenny Nelson
1st review completed  11/15/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/15/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/15/2019 DONE
Route to Impact Fee Review10/16/201910/19/201910/17/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/16/2019 10/17/2019 PASS
DetailsTroy James
Routing - Addressing10/16/2019 10/17/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/16/2019 10/16/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  10/16/2019 DONE
Intake Approval  10/16/2019 PASS
Recd Pcfee & Taken To Pln CK  10/16/2019 DONE
Routing - PLANNING10/16/2019 10/16/2019 PASS
DetailsSue Cummings
Application received  10/14/2019 DONE
Application submitted via PDS Online on Oct 14 2019 8:14AM