Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04095
StatusFinaled
Name SHILOH BUILDERS LLC
Site Address 2251 E BOISE AVE
Project Name2251 E Boise Ave.
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2419 sq. ft., two story (first story 847 sq. ft., second story 1572 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 200 sq. ft. of covered patio/porch and a 696 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20205/5/20205/6/2020PPASS
DetailsBrandon Shaw
Call dan for access code Phone #: ###-#### Inspection requested via web by Daniel Appel
DOC - Permit Finaled5/6/20205/6/20205/6/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results5/6/20205/6/20205/6/2020ADONE
DetailsBrandon Shaw
ACH50- 3.89


BLD-Final5/2/20205/4/20205/2/2020ACANC
DetailsBrandon Shaw
Please Call Dan for access Phone #: ###-#### >> Inspection requested via web by Daniel Appel Inspection cancelled from web by: Daniel Appel
BLD-Wall cover3/4/20203/5/20203/5/2020APASS
DetailsBrandon Shaw
Gyp board shear Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Energy code compliance2/28/20203/2/20203/2/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall cover2/28/20203/2/20203/2/2020PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Framing/Rough-in2/27/20202/28/20202/28/2020APASS
DetailsBrandon Shaw
Corrections SAT...
OK to insulate...
BLD-Framing/Rough-in2/25/20202/26/20202/26/2020PFAIL
DetailsBrandon Shaw
Post address...
Per plans- see pgs A1.1, A2.1, and S1.1 for location of header and window placement...
Provide revised Engineering for second fl shear walls, some walls moved/removed, see S1.1 for loaction...
BLD-Wall Bracing2/10/20202/11/20202/11/2020APASS
DetailsDave Hannah
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall Bracing2/7/20202/7/20202/7/2020PPART
DetailsBrandon Shaw
First floor only...
BLD-Foundation12/20/201912/20/201912/20/2019PPASS
DetailsBrandon Shaw
Chris- foundation wall inspection Phone #: ###-####
BLD-Footing12/18/201912/18/201912/18/2019PFAIL
DetailsBrandon Shaw
Minimum temp for soil subgrade, form, and rebar is 35 F...
Issue PAID IN FULL permit  11/27/2019 DONE
Inspection Record Card- Bld  11/27/2019 DONE
OVERRIDE  10/25/2019  
1st review completed  10/25/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  10/25/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  10/25/2019 DONE
Plan assigned to (J_N)10/17/2019 10/25/2019 DONE
DetailsJenny Nelson
10/30 sfd L1 ePlan
Routing - PLAN CHECK10/17/2019 10/25/2019 PASS
DetailsJenny Nelson
Routing - Addressing10/17/2019 10/22/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review10/18/201910/21/201910/21/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/17/2019 10/21/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING10/17/2019 10/18/2019 PASS
DetailsEthan Mansfield
Routing - PUBLIC WORKS10/17/2019 10/18/2019 PASS
DetailsMorgan Webb
CREDIT FOR DEMO
Plans ACCEPTED BY PLAN TECH  10/17/2019 DONE
Recd Pcfee & Taken To Pln CK  10/17/2019 DONE
Intake Approval  10/17/2019 PASS
Application received  10/14/2019 DONE
Application submitted via PDS Online on Oct 14 2019 8:47AM