Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04104
StatusFinaled
Name BLUE RAVEN SOLAR LLC
Site Address 5824 W RANDOLPH DR
Project NameTim Melchert PV
Customer Number 
ePlanReviewYes
Description
modification - layout change 12-5-19 **JAB** MODIFICATION - PANEL CHANGE 11/25/19 **jab** Permit for 350sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 20 panels in 3 arrays. There will be rafter-sistering work to strengthen the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201912/13/201912/13/2019PPASS
DetailsMike Jordan
Onsite contact info: Ashley Ferguson-###-####


Phone #: ###-####; Inspection requested via web by BRS Permitting
DOC - Permit Finaled12/13/201912/13/201912/13/2019PPASS
DetailsMike Jordan
BLD-Framing/Rough-in12/13/201912/13/201912/13/2019PPASS
DetailsMike Jordan
Onsite contact info: Ashley Ferguson-###-####


Phone #: ###-####; Inspection requested via web by BRS Permitting
CHANGE STATUS TO (ISS)  12/9/2019 DONE
Permit Ready to Issue  12/6/2019 DONE
Plan assigned to (JAB) Josh12/2/201912/2/201912/5/2019 PASS
DetailsJosh Bogle
12/06 PV, ePlan
Routing - PLAN CHECK12/5/2019 12/5/2019 PASS
DetailsJosh Bogle
min Plan Review fee
Plan Modification Accepted  12/2/2019 DONE
Hannah Webb from Blue Raven Solar requested a plan mod workflow started so he can submit a revised set of plans that show the layout that was installed.
Plan assigned to (JAB) Josh11/21/201911/21/201911/25/2019 PASS
DetailsJosh Bogle
Routing - PLAN CHECK11/22/2019 11/25/2019 PASS
DetailsJosh Bogle
min. plan mod fee
Permit Ready to Issue  11/25/2019 DONE
Plan Mod Approved
CHANGE STATUS TO (ISS)  11/25/2019 DONE
Plan Modification Accepted  11/21/2019 DONE
Per Hannah, Panel brand has changed, eplan workflow opended
Issue PAID IN FULL permit  10/22/2019 DONE
Inspection Record Card- Bld  10/22/2019 DONE
Plan assigned to (JAB) Josh10/15/201910/15/201910/21/2019 PASS
DetailsJosh Bogle
10/21 PV, ePlan
Routing - PLAN CHECK10/15/2019 10/21/2019 PASS
DetailsJosh Bogle
1st review completed  10/21/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/21/2019 DONE
DetailsJosh Bogle
ESC no - Energy no
Permit Ready to Issue  10/21/2019 DONE
met
Routing - PLANNING10/15/2019 10/15/2019 PASS
DetailsSue Cummings
Plans ACCEPTED BY PLAN TECH  10/15/2019 DONE
Recd Pcfee & Taken To Pln CK  10/15/2019  
no intake fee taken, 406
Intake Approval  10/15/2019 PASS
Application received  10/14/2019 DONE
Application submitted via PDS Online on Oct 14 2019 12:09PM