Permanent Occupancy | | | 12/31/2019 | | DONE |
|
|
|
|
BLD-Final | 12/24/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
FIRE-Final Inspection | 12/27/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguishers are placed with current inspection yags. Final life fire safety inspection complete, signature provided on permit sign off card.
Justin Phone #: ###-####
|
FIRE-Final Inspection | 12/24/2019 | 12/27/2019 | 12/27/2019 | A | FAIL |
Jim Page
|
|
|
Exterior emergency light above north exit door did not operate when AC power was isolate. Provide exit sign above door leading from warehouse to office area as shown on city approved drawings. Remove slide bolt lock that is installed on the northeast door of office area.
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, restroom ok to cover
|
Telephone call | | | 11/22/2019 | | DONE |
|
|
|
released eplan per email request from Jon Chatfield
|
Issue PAID IN FULL permit | | | 11/12/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/12/2019 | | DONE |
|
|
|
|
Plan assigned to (JG) | 10/22/2019 | 10/22/2019 | 11/5/2019 | | PASS |
Javier Guzman
|
|
|
11/01 L2 5410 State Steet TI ePlan
|
Routing - PLAN CHECK | 10/22/2019 | | 11/5/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 11/5/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2019 | | DONE |
|
|
|
all met
NEED
GC
Revised Certificate of Value
|
Routing - FIRE | 10/22/2019 | 10/22/2019 | 10/31/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. No change of use or occupancy. Restroom remodel. Inspector to field verify life safety.
|
Routing PW Flood Plain | 10/22/2019 | | 10/29/2019 | | PASS |
Jason C. Taylor
|
|
|
Project is outside Special Flood Hazard Area, no floodplain review required. If you have any questions, please call Jason Taylor at ###-####.
|
Routing - PLUMBING | 10/22/2019 | | 10/25/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 10/22/2019 | | 10/23/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 10/22/2019 | | 10/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 10/22/2019 | | 10/22/2019 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 10/21/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 10/15/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• Provide a new wall construction details/sections including wall bracing method
|
Application received | | | 10/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 14 2019 12:36PM
|