Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04118
StatusFinaled
Name AURIC SOLAR
Site Address 3402 W KIPLING RD
Project Name178001, Walhof PV
Customer Number 
ePlanReviewYes
Description
Permit for 440sq' of roof-mounted, grid-tied Photo-voltaic panels with micro-inverters; 25 panels in 3 arrays. There will be collar-tie work to strengthen a portion of the existing roof structure per engineer’s roof evaluation. All racking, modules, and other listed equipment must be installed by a certified installer. All work per plans, engineering, manufacturer’s specs, & local code. Separate electrical permit required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/19/201912/20/201912/20/2019APASS
DetailsTell Riley
Pls contact Brad (Foreman) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes//corrections made to framing per updated engineering refering to nails used//
DOC - Permit Finaled12/20/201912/20/201912/20/2019PPASS
DetailsTell Riley
BLD-Final12/13/201912/18/201912/18/2019AFAIL
DetailsTell Riley
Homeowner has requested this inspection to be as early as possible. please contact her @ ###-####, Ramona Walhof. She is Blind so please be patient with her. Thanks Phone #: ###-#### Inspection requested via web by Rob Maes//need to add nails per detail for collar ties//16d nails or sds screws as speced//looks to be 10d nails//
BLD-Final12/13/201912/13/201912/13/2019PCANC
DetailsTell Riley
Please call Mike with Questions or concerns. ###-#### Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
Issue PAID IN FULL permit  11/19/2019 DONE
Inspection Record Card- Bld  11/19/2019 DONE
Plan assigned to (JAB) Josh10/15/201910/15/201911/18/2019 PASS
DetailsJosh Bogle
10/21 PV, ePlan - ist done
Routing - PLAN CHECK11/18/2019 11/18/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK11/18/2019 11/18/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/18/2019 DONE
DetailsJosh Bogle
ESC no - Energy no - 1hr min. Plan Review fee for 4th review
Permit Ready to Issue  11/18/2019 DONE
met
Routing - PLAN CHECK11/13/2019 11/13/2019 FAIL
DetailsJosh Bogle
1st review completed  10/21/2019 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK10/15/2019 10/21/2019 FAIL
DetailsJosh Bogle
Application received  10/15/2019 DONE
Application submitted via PDS Online on Oct 15 2019 8:34AM
Plans ACCEPTED BY PLAN TECH  10/15/2019 DONE
Intake Approval  10/15/2019 PASS
Recd Pcfee & Taken To Pln CK  10/15/2019 DONE
Routing - PLANNING10/15/2019 10/15/2019 PASS
DetailsSue Cummings