Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD19-04123
StatusFinaled
Name STRITE DESIGN & REMODEL
Site Address 817 E HIGHLAND VIEW DR
Project NameWalter Addition
Customer Number 
ePlanReviewNo
Description
Permit to add a 600sq' 2nd level addition above the garage. Addtion includes two Bedrooms and a Full Bath. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20206/11/20206/11/2020PPASS
DetailsTony Young
screened // Jaman Phone #: ###-####
DOC - Permit Finaled6/11/20206/11/20206/11/2020PPASS
DetailsTony Young
BLD-Conference6/10/20206/11/20206/11/2020APART
DetailsTony Young
screened // Jaman Phone #: ###-####,, ok after firecaulking and handrail in garage
BLD-Energy code compliance2/26/20202/28/20202/28/2020PPASS
DetailsDave Hannah
jAMAN- Phone #: ###-####
BLD-Framing/Rough-in2/26/20202/26/20202/26/2020PPASS
DetailsTony Young
jAMAN- Phone #: ###-####,, ok to insulate,, verify seal pack
BLD-Energy code compliance2/26/20202/27/20202/26/2020PCANC
DetailsTony Young
jAMAN- Phone #: ###-####
Routing - MECHANICAL1/29/2020 1/29/2020 PASS
DetailsTroy James
submitted manual j report.
BLD-Footing11/25/201911/26/201911/26/2019APASS
DetailsTony Young
Matt Phone #: ###-####,, point load footings added to existing footings on garage front and stair footing inside garage,, okayed be engineer
BLD-Footing11/25/201911/25/201911/25/2019PFAIL
DetailsBrandon Shaw
No approved plans or permit on site...
Routing Walk-In (Zoning)10/15/201910/15/201910/15/2019APASS
DetailsJeff Lowe
Routing Walk-In (BLD)10/15/201910/15/201910/15/2019ADONE
DetailsJosh Bogle
Routing - PLAN CHECK10/15/2019 10/15/2019 PASS
DetailsJosh Bogle
1st review completed  10/15/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  10/15/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/15/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/15/2019 DONE
DetailsJosh Bogle
ESC no - Energy yes
Permit Ready to Issue  10/15/2019 DONE
Meeting  10/15/2019 DONE
No new footings, Check with Tisha. Josh B didn't send to hillside.
Issue PAID IN FULL permit  10/15/2019 DONE
Application received 10/15/2019