BLD-Framing/Rough-in | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Tony Young
|
|
|
call 1 hour for access- Paul Phone #: ###-####,, ok to cover
|
Routing Walk-In (BLD) | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/17/2019 | | 10/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/17/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 10/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/15/2019 | | 10/15/2019 | | FAIL |
Brian McGowan
|
|
|
Not enough info on existing structure.
Need an overall floor plan.
|
1st review completed | | | 10/15/2019 | | FAIL |
Brian McGowan
|
|
|
Not enough info on existing structure.
Need an overall floor plan.
|
Application received | | 10/15/2019 | | | |
|
|
|
|