BLD-Wall cover | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PASS |
Brandon Shaw
|
|
|
Wall cover inspection to cover walls with drywall. All other trades have reported inspections completed and passed. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Energy code compliance | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | PASS |
Brandon Shaw
|
|
|
Building insulation inspection prior to drywall. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Framing/Rough-in | 3/18/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Jim Storey
|
|
|
Jimmy Phone #: ###-####
|
BLD-Framing/Rough-in | 3/11/2020 | 3/17/2020 | 3/17/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection for Nailing and exterior wall Cover building C (garage Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Foundation | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Brandon Shaw
|
|
|
Pending special inspection...
|
Print Occupancy Form | | | 11/15/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/15/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2019 | | DONE |
|
|
|
send email to GC to- dominickf@cmcompany.com inform them that they need to contact ACHD regarding fees
|
Plan assigned to (CJW) | 9/5/2019 | 10/16/2019 | 11/13/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 10/09/19 (New Building - 25 days) (eplan - 128 sheets) Delta Dental of Idaho - Building C (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/13/2019 | | DONE |
|
|
|
DO NOT ISUUE WITHOUT BLD19-03342
met
*ACHD (fee is under/attached bld19-03342)
met- GC
Revised Certificate of Value
|
Meeting | | | 11/13/2019 | | DONE |
|
|
|
per Andy Long the ESC on the BLD03342 is all that is needed for this case
|
Routing Off Site - STRUCTURAL | 11/5/2019 | | 11/13/2019 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - FIRE | 11/5/2019 | 11/5/2019 | 11/12/2019 | | PASS |
Mark Stumbaugh
|
|
|
|
Routing - PLAN CHECK | 10/31/2019 | | 11/7/2019 | | PASS |
Carl Westfall
|
|
|
Approved with red lines
|
Plan resubmittals received | | | 10/31/2019 | | DONE |
|
|
|
Resubmitted late on a Thursday night. Plans Examiner was out of the office until Tuesday. There was no time to route the drawings before he left.
|
Route to Impact Fee Review | 10/21/2019 | 10/24/2019 | 10/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 10/21/2019 | | DONE |
|
|
|
|
Routing - FIRE | 9/5/2019 | 10/16/2019 | 10/18/2019 | | FAIL |
Mark Stumbaugh
|
|
|
SEE REVIEW COMMENTS FOR BLD19-03342
10/16 (502) Delta Dental of Idaho Addition
|
1st review completed | | | 10/18/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/17/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/18/2019 | | 10/16/2019 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 9/18/2019 | | 10/2/2019 | | PASS |
Josh Wilson
|
|
|
Ok per DRH19-00054
|
Routing Off Site - STRUCTURAL | 9/18/2019 | | 9/24/2019 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - PLANNING | 9/18/2019 | | 9/20/2019 | | PASS |
David Moser
|
|
|
See DRH19-00054
|
Routing - MECHANICAL | 9/18/2019 | | 9/20/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 9/18/2019 | | 9/19/2019 | | PASS |
DeAnn Brown
|
|
|
New building to connect to existing sewer stub
|
Routing PW Solid Waste | 9/18/2019 | | 9/18/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 9/18/2019 | | 9/18/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Addressing | 9/18/2019 | | 9/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/18/2019 | | 9/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 9/18/2019 | | 9/18/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Street Lights | 9/18/2019 | | 9/18/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 9/18/2019 | | 9/8/2019 | | PASS |
Brian Murphy
|
|
|
|
Intake Approval | | | 9/5/2019 | | FAIL |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/3/2019 | | FAIL |
|
|
|
Previous request not addressed (I have tried viewing in different internet browser with no success, it is the responsible person in charge to upload these mechanical plans so that they are viewable. contact the mechanical firm and coordinate how to make the stamp viewable on all the mechanical plans)
Provide and upload the following for prescreen:
•All the uploaded mechanical plans engineering stamp is blackened and will not show the engineers information, number, signature, date when printed revise so the engineering stamp is not blackened.
|
Intake Approval | | | 8/30/2019 | | FAIL |
Javier Guzman
|
|
|
Provide and upload the following for prescreen:
• Provide a signed and approved by PDS Subdivision Staff Verification of Legal Lot or Parcel form (form uploaded is not signed)
• Provide site specific fire flow at hydrants letter from Suez Water or other public water provider
• Provide DR/Planning & Zoning letters of approval.
• Provide Drainage System Operation & Maintenance Plan Agreement (appendix J from Public Works Stormwater Manual) Must be completely filled out and notarized prior to submittal.
• Provide an Erosion & Sediment Control (ESC) Narrative, Narrative must be designed for the specific project and be prepared and signed by a plan designer certified by Boise City.
• Provide on checklist location of the commissioning plan
• All the uploaded mechanical plans engineering stamp is blackened and will not show the engineers information, number, signature, date when printed revise so the engineering stamp is not blackened.
|
Application received | | 10/16/2019 | | | |
|
|
|
Building C separated from Building A/B
|
Application received | | 8/29/2019 | | | |
|
|
|
|