BLD-Final | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Homeowner will be home Phone #: ###-#### Inspection requested via web by Taylor Richards
|
DOC - Permit Finaled | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 11/27/2019 | 11/27/2019 | 11/27/2019 | P | PASS |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
PubWorks Subgrade Approval | 11/27/2019 | 11/27/2019 | 11/27/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 11/25/2019 | 11/25/2019 | 11/25/2019 | P | NR |
Brandon Shaw
|
|
|
Need soil subgrade submitted and approved by PW...
|
Routing Walk-In (BLD) | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Plan assigned to (JAB) Josh | 11/20/2019 | 11/20/2019 | 11/20/2019 | | PASS |
Josh Bogle
|
|
|
11/26 deck, paper
|
Routing PW Grading-Hillside | 11/20/2019 | | 11/20/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 11/20/2019 | | 11/20/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/20/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 11/20/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/20/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/17/2019 | 10/17/2019 | 10/17/2019 | P | FAIL |
Josh Bogle
|
|
|
needs engineering for footings and lateral
|
1st review completed | | | 10/17/2019 | | FAIL |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/17/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/17/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/17/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | 10/17/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 10/17/2019 | | 10/17/2019 | | PASS |
Sue Cummings
|
|
|
|
Application received | | 10/17/2019 | | | |
|
|
|
|