BLD-Footing | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Jim Storey
|
|
|
Dax Phone #: ###-####
|
BLD-Foundation | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
Jim Storey
|
|
|
Francis Phone #: ###-####
|
BLD-Footing | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Jim Storey
|
|
|
Fransic Phone #: ###-####
|
PubWorks Subgrade Approval | 2/18/2020 | 2/18/2020 | 2/18/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2020 | | DONE |
|
|
|
email permits to be sign to -Amy Kelley EPLAN needs to be release
|
OVERRIDE | | | 1/28/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 12/13/2019 | 12/13/2019 | 1/28/2020 | | DONE |
Jenny Nelson
|
|
|
1st complete, waiting for hillside
|
Routing PW Grading-Hillside | 1/28/2020 | | 1/28/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2020 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 1/28/2020 | | DONE |
|
|
|
|
1st review completed | | | 12/30/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 12/16/2019 | | 12/26/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLAN CHECK | 12/13/2019 | | 12/17/2019 | | PASS |
Jenny Nelson
|
|
|
|
Route to Impact Fee Review | 12/13/2019 | 12/16/2019 | 12/16/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 12/13/2019 | 12/13/2019 | 12/16/2019 | | PASS |
Lee G Meredith
|
|
|
New SFH
Sprinklers are not required.
|
Routing - Erosion and Sediment | 12/13/2019 | | 12/16/2019 | | PASS |
Michael Zawacki
|
|
|
|
Routing - MECHANICAL | 12/13/2019 | | 12/16/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 12/13/2019 | | 12/16/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/13/2019 | | 12/16/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 12/13/2019 | | 12/13/2019 | | PASS |
Jeff Lowe
|
|
|
|
Intake Approval | | | 12/13/2019 | | PASS |
|
|
|
|
Intake Approval | | | 10/21/2019 | | FAIL |
|
|
|
1) Please upload the site specific grading and drainage plan for the lot. 2) the geotechnical engineer will need to provide a letter with conclusions and recommendations regarding the adequacy of the site to be developed as proposed in the construction and grading plans, including the stability of slopes. --Melissa Jannusch ###-####
Also need ESC plan and ESC narrative
|
Application received | | | 10/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2019 9:51AM
|