Permit Information
Permit NumberBLD19-04163
StatusIssued
Name BLACKROCK HOMES LLC
Site Address 2243 E MENDOTA DR
Project Name11-2 MR1
Customer Number 
ePlanReviewYes
Description
***W.U.I. VALLEY PERIMETER LOT ZONE B; CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR MATERIALS REQUIRED*** Permit for the construction of a new 1744 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 217 sq. ft. of covered patio/porch and a 452 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1C zoning and setbacks per planning. ***RDP*** ***Sprinklers are not required***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Footing5/4/20205/5/20205/5/2020APASS
DetailsJim Storey
Dax Phone #: ###-####
BLD-Foundation3/16/20203/17/20203/17/2020APASS
DetailsJim Storey
wall // Edgar Phone #: ###-####
BLD-Footing3/11/20203/12/20203/12/2020APASS
DetailsJim Storey
Edgar Phone #: ###-####
PubWorks Subgrade Approval3/12/20203/12/20203/12/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Footing3/4/20203/5/20203/5/2020ANR
DetailsJim Storey
edgar Phone #: ###-####
Issue PAID IN FULL permit  2/6/2020 DONE
Inspection Record Card- Bld  2/6/2020 DONE
OVERRIDE  2/3/2020  
Plan assigned to (RDP)12/24/201912/24/20192/3/2020 DONE
DetailsRob Patrick
01/10 sfd L2 ePlan...12/30 Failed...01/21 Failed, waiting for Melissa to review
Routing - PLAN CHECK2/3/2020 2/3/2020 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/3/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/3/2020 DONE
met
Routing PW Grading-Hillside1/28/2020 1/28/2020 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PLAN CHECK1/21/2020 1/21/2020 FAIL
DetailsRob Patrick
Comments Not Addressed...waiting for Melissa to review
1st review completed  12/30/2019 FAIL
DetailsRob Patrick
Corrections Required
Routing - PLAN CHECK12/24/2019 12/30/2019 FAIL
DetailsRob Patrick
Corrections Required
Routing - Erosion and Sediment12/24/2019 12/27/2019 PASS
Details
ESC plan approved. RP listed
Route to Impact Fee Review12/24/201912/27/201912/26/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - FIRE12/24/201912/24/201912/26/2019 PASS
DetailsLee G Meredith
Sprinklers are not required.
Routing PW Grading-Hillside12/24/2019 12/26/2019 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan
Routing - PUBLIC WORKS12/24/2019 12/26/2019 PASS
DetailsCandy A. Nichols
Routing - MECHANICAL12/24/2019 12/26/2019 PASS
DetailsTroy James
Routing - PLANNING12/24/2019 12/24/2019 PASS
DetailsJeff Lowe
Routing - Addressing12/24/2019 12/24/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  12/24/2019 DONE
Intake Approval  12/24/2019 PASS
Recd Pcfee & Taken To Pln CK  12/24/2019 DONE
Intake Approval  10/21/2019 FAIL
Please provide the Erosion & Sediment Control Plans and Erosion & Sediment Narrative or SWPPP for this project.
Please provide the information below.

1) Please upload the site specific grading and drainage plan for the lot. 2) the geotechnical engineer will need to provide a letter with conclusions and recommendations regarding the adequacy of the site to be developed as proposed in the construction and grading plans, including the stability of slopes. --Melissa Jannusch ###-####
Application received  10/18/2019 DONE
Application submitted via PDS Online on Oct 18 2019 10:01AM