BLD-Footing | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PASS |
Jim Storey
|
|
|
Dax Phone #: ###-####
|
BLD-Foundation | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Storey
|
|
|
wall // Edgar Phone #: ###-####
|
BLD-Footing | 3/11/2020 | 3/12/2020 | 3/12/2020 | A | PASS |
Jim Storey
|
|
|
Edgar Phone #: ###-####
|
PubWorks Subgrade Approval | 3/12/2020 | 3/12/2020 | 3/12/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | NR |
Jim Storey
|
|
|
edgar Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/6/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/6/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 2/3/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 12/24/2019 | 12/24/2019 | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
01/10 sfd L2 ePlan...12/30 Failed...01/21 Failed, waiting for Melissa to review
|
Routing - PLAN CHECK | 2/3/2020 | | 2/3/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/3/2020 | | DONE |
|
|
|
met
|
Routing PW Grading-Hillside | 1/28/2020 | | 1/28/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PLAN CHECK | 1/21/2020 | | 1/21/2020 | | FAIL |
Rob Patrick
|
|
|
Comments Not Addressed...waiting for Melissa to review
|
1st review completed | | | 12/30/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - PLAN CHECK | 12/24/2019 | | 12/30/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - Erosion and Sediment | 12/24/2019 | | 12/27/2019 | | PASS |
|
|
|
ESC plan approved. RP listed
|
Route to Impact Fee Review | 12/24/2019 | 12/27/2019 | 12/26/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 12/24/2019 | 12/24/2019 | 12/26/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Routing PW Grading-Hillside | 12/24/2019 | | 12/26/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - PUBLIC WORKS | 12/24/2019 | | 12/26/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - MECHANICAL | 12/24/2019 | | 12/26/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 12/24/2019 | | 12/24/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 12/24/2019 | | 12/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/24/2019 | | DONE |
|
|
|
|
Intake Approval | | | 12/24/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/24/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/21/2019 | | FAIL |
|
|
|
Please provide the Erosion & Sediment Control Plans and Erosion & Sediment Narrative or SWPPP for this project.
Please provide the information below.
1) Please upload the site specific grading and drainage plan for the lot. 2) the geotechnical engineer will need to provide a letter with conclusions and recommendations regarding the adequacy of the site to be developed as proposed in the construction and grading plans, including the stability of slopes. --Melissa Jannusch ###-####
|
Application received | | | 10/18/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 18 2019 10:01AM
|