BLD-Final | 10/22/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Dave Hannah
|
|
|
TAMMI Phone #: ###-####
|
FIRE-Final Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection complete.
|
FIRE-Final Inspection | 10/22/2019 | 10/29/2019 | 10/29/2019 | A | FAIL |
Jim Page
|
|
|
Called point of contact provided at 8:57AM, left a message stating that if I did not hear back from point of contact by 9:15 then I will procceed to next inspection, no return call was received by 9:15, a reschedule for life fire safety inspection will need to be requested.
TAMMI Phone #: ###-####
|
Permanent Occupancy | | | 10/29/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/22/2019 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 10/18/2019 | 10/18/2019 | 10/21/2019 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/18/2019 | | 10/21/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/21/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/21/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/21/2019 | | DONE |
Brian McGowan
|
|
|
|
Print Occupancy Form | | | 10/21/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/21/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 10/21/2019 | | DONE |
|
|
|
Spoke with the front office to inform them the permit is ready to pick up.
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/18/2019 | | PASS |
|
|
|
|
First Notice | | 11/8/2019 | | | |
|
|
|
|
Application received | | 10/18/2019 | | | |
|
|
|
|