BLD-Final | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 6/10/2020 | 6/10/2020 | 6/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/10/2020 | 6/10/2020 | 6/10/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.8
|
PubWorks Occupancy Approval | 6/9/2020 | 6/9/2020 | 6/9/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Energy code compliance | 2/27/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Other | 2/24/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 1/1/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 12/30/2019 | 12/30/2019 | 12/30/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 12/10/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/25/2019 | 11/25/2019 | 12/10/2019 | | DONE |
Jenny Nelson
|
|
|
1st complete, failed hillside
|
Routing PW Grading-Hillside | 12/10/2019 | | 12/10/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/10/2019 | | DONE |
|
|
|
met
|
1st review completed | | | 11/26/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 10/30/2019 | | 11/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
Plan assigned to (RDP) | 10/30/2019 | 10/30/2019 | 11/25/2019 | | DEFR |
Rob Patrick
|
|
|
11/18 sfd L2 ePlan
|
Routing PW Grading-Hillside | 10/30/2019 | | 11/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Route to Impact Fee Review | 10/30/2019 | 11/2/2019 | 10/31/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 10/30/2019 | | 10/31/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - FIRE | 10/30/2019 | 10/30/2019 | 10/30/2019 | | PASS |
Lee G Meredith
|
|
|
Sprinklers are not required.
|
Routing - PLANNING | 10/30/2019 | | 10/30/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 10/30/2019 | | 10/30/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 10/30/2019 | | 10/30/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 10/30/2019 | | 10/30/2019 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/30/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/30/2019 | | PASS |
|
|
|
|
Intake Approval | | | 10/28/2019 | | FAIL |
|
|
|
10-28-19 2nd Prescreen all plans sheets must be a minimum of 18x24, your erosion plan sheets are by 11x17
|
Intake Approval | | | 10/22/2019 | | FAIL |
|
|
|
1st prescreen: Need full sized ESC plan in drawings (see pages 18 and 19 of ESC document). Site plan needs to show distance from structure to property lines.
|
Application received | | | 10/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 21 2019 10:36AM
|