Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD19-04202
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2377 S TRAPPER PL
Project Namelot 11 block 1 harris north
Customer Number 
ePlanReviewYes
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED**WUI - HILLSIDE - Permit for the construction of a new 2,568sq' one-story, single family dwelling with 3 bedrooms, 2 bathrooms, approximately 281sq' of covered patio/porch and a 736sq' attached garage per the approved plans, notations, local codes and ordinances. R-1C zoning and setbacks per Planning. **JAB** ***Sprinklers are not required***LGM **
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/4/20205/5/20205/5/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled5/5/20205/5/20205/5/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results5/5/20205/5/20205/5/2020ADONE
DetailsBrandon Shaw
ACH50- 3.89
BLD-Final5/4/20205/4/20205/4/2020PCANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
PubWorks Occupancy Approval5/4/20205/4/20205/4/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection has been received by Public Works Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Other2/14/20202/18/20202/18/2020APASS
DetailsBrandon Shaw
Soffit...
BLD-Energy code compliance2/10/20202/11/20202/11/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in2/7/20202/7/20202/7/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing1/21/20201/22/20201/22/2020APASS
DetailsBrandon Shaw
shear // Les Phone #: ###-####
BLD-Foundation12/29/201912/30/201912/30/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing12/27/201912/27/201912/27/2019PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
PubWorks Subgrade Approval12/24/201912/24/201912/24/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  12/6/2019 DONE
Inspection Record Card- Bld  12/6/2019 DONE
Telephone call  12/6/2019 DONE
emailed permits to be sign to - kdavis@boisehunterhomes.com Eplan will need to be release
OVERRIDE  11/26/2019  
Plan assigned to (RDP)10/30/201910/30/201911/26/2019 DEFR
DetailsRob Patrick
11/18 sfd L2 ePlan
Routing - PLAN CHECK10/30/2019 11/26/2019 PASS
DetailsRob Patrick
1st review completed  11/26/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  11/26/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  11/26/2019 DONE
Routing PW Grading-Hillside10/30/2019 11/4/2019 PASS
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Route to Impact Fee Review10/30/201911/2/201910/31/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL10/30/2019 10/31/2019 PASS
DetailsTroy James
Routing - FIRE10/30/201910/30/201910/30/2019 PASS
DetailsLee G Meredith
Sprinklers are not required.
Routing - PLANNING10/30/2019 10/30/2019 PASS
DetailsSue Cummings
Routing - Addressing10/30/2019 10/30/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/30/2019 10/30/2019 PASS
DetailsCandy A. Nichols
Routing - Erosion and Sediment10/30/2019 10/30/2019 PASS
DetailsMichael Zawacki
Plans ACCEPTED BY PLAN TECH  10/30/2019 DONE
Recd Pcfee & Taken To Pln CK  10/30/2019 DONE
Intake Approval  10/30/2019 PASS
Intake Approval  10/28/2019 FAIL
10-28-19 2nd Prescreen all plans sheets must be a minimum of 18x24, your erosion plan sheets are by 11x17

Intake Approval  10/22/2019 FAIL
Please upload full size ESC plan in the drawings folder (minimum 18x24)
Application received  10/21/2019 DONE
Application submitted via PDS Online on Oct 21 2019 2:31PM