Permit Information
Permit NumberBLD19-04204
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3322 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 4008 sq. ft., two story (first story 3114 sq. ft., second story 894 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 469 sq. ft. of covered patio/porch and a 1083 sq. ft. attached garage per the approved plans and any notations. R-1ADA zoning and setbacks per planning. JJN ***Sprinklers are required and are being provided, as noted on sheet A101***LGM

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/29/20207/29/20207/29/2020PPASS
DetailsBrandon Shaw
Brian- ###-####
DOC - Permit Finaled7/29/20207/29/20207/29/2020PPASS
DetailsBrandon Shaw
PubWorks Occupancy Approval7/29/20207/29/20207/29/2020 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer/landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
Override - Parcel Holds7/29/20201/1/19007/29/2020  
this hold is for the pool thru PZ does not apply to this inspection
Override - Parcel Holds  7/29/2020  
Override - Parcel Holds  7/29/2020  
BLD-Conference7/28/20207/28/20207/28/2020PDONE
DetailsBrandon Shaw
Prefinal walk thru...
Override - Parcel Holds7/28/20201/1/19007/28/2020  
their is a CFH application with planning and zoning for a pool.
Routing - MECHANICAL3/31/2020 3/31/2020 PASS
DetailsTroy James
Resubmitted ACCA report
BLD-Energy code compliance3/30/20203/30/20203/30/2020PPASS
DetailsTell Riley
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//windows ok//walls ok// ceiling has R38 batts visible, person onsite said r11 was installed above the r38//check insulation certificate at final for r49 in attic//crawl space insulation has not been insulated//
BLD-Framing/Rough-in3/26/20203/26/20203/26/2020PPASS
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Wall Bracing3/18/20203/18/20203/18/2020PPART
DetailsTell Riley
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//ok other than a couple floor to floor straps-talked with framer//can check at framing//
BLD-Wall Bracing3/17/20203/17/20203/17/2020PFAIL
DetailsJim Storey
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch missing horr straps.
Fees Due Hold3/17/2020 3/17/2020 CANC
DetailsGemma Flores
Routing - MECHANICAL3/16/2020 3/16/2020 PASS
DetailsTroy James
Resubmitted ACCA report
Plan Modification Accepted  3/16/2020  
MANUAL J
Plan Modification Accepted  2/28/2020 DONE
manual j
Routing - MECHANICAL2/28/2020 2/28/2020 PASS
DetailsTroy James
Resubmitted manual j report. 1 hour review time
BLD-Foundation12/31/201912/31/201912/31/2019PPASS
DetailsDave Hannah
Thanks Eric Williams Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Footing12/10/201912/11/201912/11/2019APASS
DetailsBrandon Shaw
Work in progress...
PubWorks Subgrade Approval12/11/201912/11/201912/11/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  12/4/2019 DONE
Inspection Record Card- Bld  12/4/2019 DONE
OVERRIDE  11/19/2019  
Plan assigned to (J_N)10/21/201910/21/201911/19/2019 DONE
DetailsJenny Nelson
11/07 sfd L2 ePlan. 1st Complete 11/8, need shear schedule clear on plans, failed hillside
Routing PW Grading-Hillside11/19/2019 11/19/2019 PASS
DetailsMelissa Jannusch


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

Routing - PUBLIC WORKS11/19/2019 11/19/2019 PASS
DetailsCandy A. Nichols
took to Jenny
Routing - PLAN CHECK11/19/2019 11/19/2019 PASS
DetailsJenny Nelson
Case Summary (BLD)  11/19/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/19/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/19/2019 DONE
Inspection Record Card- Bld  11/19/2019 DONE
Telephone call  11/19/2019 DONE
Spoke with Bryan to infrom him the permit is ready and what fees are due.
1st review completed  11/8/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK10/21/2019 11/8/2019 FAIL
DetailsJenny Nelson
Can't read shear wall schedule on plan sheet
Routing - FIRE10/21/201910/21/201911/7/2019 PASS
DetailsLee G Meredith
11/07 (404) 3322 E Windsong SFD, Paper

Drawing A101 indicates that sprinklers will be provided (as required). No review comments provided.
Routing - MECHANICAL11/4/2019 11/6/2019 PASS
DetailsTroy James
Routing - Erosion and Sediment11/6/2019 11/6/2019 PASS
DetailsMichael Zawacki
Site prep inspection required.
Routing - PLANNING11/4/2019 11/4/2019 PASS
DetailsJeff Lowe
approved pending PW hillside approval
Routing PW Grading-Hillside10/25/2019 11/4/2019 FAIL
DetailsMelissa Jannusch
Needs signed grading plans
Plan resubmittals received  11/4/2019 DONE
four copies of sheet C1 taken to Jenny
Routing - PUBLIC WORKS10/21/2019 11/4/2019 FAIL
DetailsCandy A. Nichols
SEE PW HILLSIDE FAIL
Routing - Addressing10/21/2019 10/25/2019 PASS
DetailsDoug Chausow
Route to Impact Fee Review10/21/201910/24/201910/22/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Telephone call  10/21/2019 DONE
added remaining value of 134100. fees were calculated as regular house when should have been hillside
Plans ACCEPTED BY PLAN TECH  10/21/2019 DONE
Intake Approval  10/21/2019 PASS
Recd Pcfee & Taken To Pln CK  10/21/2019 DONE
Application received 10/21/2019