BLD-Final | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Brandon Shaw
|
|
|
Brian- ###-####
|
DOC - Permit Finaled | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/29/2020 | 7/29/2020 | 7/29/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer/landscape architect indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
Override - Parcel Holds | 7/29/2020 | 1/1/1900 | 7/29/2020 | | |
|
|
|
this hold is for the pool thru PZ does not apply to this inspection
|
Override - Parcel Holds | | | 7/29/2020 | | |
|
|
|
|
Override - Parcel Holds | | | 7/29/2020 | | |
|
|
|
|
BLD-Conference | 7/28/2020 | 7/28/2020 | 7/28/2020 | P | DONE |
Brandon Shaw
|
|
|
Prefinal walk thru...
|
Override - Parcel Holds | 7/28/2020 | 1/1/1900 | 7/28/2020 | | |
|
|
|
their is a CFH application with planning and zoning for a pool.
|
Routing - MECHANICAL | 3/31/2020 | | 3/31/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report
|
BLD-Energy code compliance | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Tell Riley
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//windows ok//walls ok// ceiling has R38 batts visible, person onsite said r11 was installed above the r38//check insulation certificate at final for r49 in attic//crawl space insulation has not been insulated//
|
BLD-Framing/Rough-in | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Wall Bracing | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PART |
Tell Riley
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//ok other than a couple floor to floor straps-talked with framer//can check at framing//
|
BLD-Wall Bracing | 3/17/2020 | 3/17/2020 | 3/17/2020 | P | FAIL |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch missing horr straps.
|
Fees Due Hold | 3/17/2020 | | 3/17/2020 | | CANC |
Gemma Flores
|
|
|
|
Routing - MECHANICAL | 3/16/2020 | | 3/16/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report
|
Plan Modification Accepted | | | 3/16/2020 | | |
|
|
|
MANUAL J
|
Plan Modification Accepted | | | 2/28/2020 | | DONE |
|
|
|
manual j
|
Routing - MECHANICAL | 2/28/2020 | | 2/28/2020 | | PASS |
Troy James
|
|
|
Resubmitted manual j report. 1 hour review time
|
BLD-Foundation | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Dave Hannah
|
|
|
Thanks Eric Williams Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 12/11/2019 | 12/11/2019 | 12/11/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/4/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/4/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/19/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 10/21/2019 | 10/21/2019 | 11/19/2019 | | DONE |
Jenny Nelson
|
|
|
11/07 sfd L2 ePlan. 1st Complete 11/8, need shear schedule clear on plans, failed hillside
|
Routing PW Grading-Hillside | 11/19/2019 | | 11/19/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing - PUBLIC WORKS | 11/19/2019 | | 11/19/2019 | | PASS |
Candy A. Nichols
|
|
|
took to Jenny
|
Routing - PLAN CHECK | 11/19/2019 | | 11/19/2019 | | PASS |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 11/19/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2019 | | DONE |
|
|
|
Spoke with Bryan to infrom him the permit is ready and what fees are due.
|
1st review completed | | | 11/8/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 10/21/2019 | | 11/8/2019 | | FAIL |
Jenny Nelson
|
|
|
Can't read shear wall schedule on plan sheet
|
Routing - FIRE | 10/21/2019 | 10/21/2019 | 11/7/2019 | | PASS |
Lee G Meredith
|
|
|
11/07 (404) 3322 E Windsong SFD, Paper
Drawing A101 indicates that sprinklers will be provided (as required). No review comments provided.
|
Routing - MECHANICAL | 11/4/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 11/6/2019 | | 11/6/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
|
Routing - PLANNING | 11/4/2019 | | 11/4/2019 | | PASS |
Jeff Lowe
|
|
|
approved pending PW hillside approval
|
Routing PW Grading-Hillside | 10/25/2019 | | 11/4/2019 | | FAIL |
Melissa Jannusch
|
|
|
Needs signed grading plans
|
Plan resubmittals received | | | 11/4/2019 | | DONE |
|
|
|
four copies of sheet C1 taken to Jenny
|
Routing - PUBLIC WORKS | 10/21/2019 | | 11/4/2019 | | FAIL |
Candy A. Nichols
|
|
|
SEE PW HILLSIDE FAIL
|
Routing - Addressing | 10/21/2019 | | 10/25/2019 | | PASS |
Doug Chausow
|
|
|
|
Route to Impact Fee Review | 10/21/2019 | 10/24/2019 | 10/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Telephone call | | | 10/21/2019 | | DONE |
|
|
|
added remaining value of 134100. fees were calculated as regular house when should have been hillside
|
Plans ACCEPTED BY PLAN TECH | | | 10/21/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/21/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/21/2019 | | DONE |
|
|
|
|
Application received | | 10/21/2019 | | | |
|
|
|
|