Permit Information
Permit NumberBLD19-04210
StatusFinaled
Name STRITE DESIGN & REMODEL
Site Address 1924 N HARRISON BLVD
Project NameADU
Customer NumberCAA19-00176
ePlanReviewNo
Description
Permit to demo an existing 639sq' Accessory Dwelling Unit and replace it with a 613sq' garage with a 387sq' 1bd/1bth ADU above. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/26/20206/29/20206/29/2020APASS
DetailsJim Storey
Michael Phone #: ###-####
DOC - Permit Finaled6/29/20206/29/20206/29/2020PPASS
DetailsJim Storey
Zoning Approval6/24/20206/24/20206/24/2020 DONE
DetailsTed Vanegas
BLD-Final5/19/20205/19/20205/19/2020PNR
DetailsTony Young
Michael Phone #: ###-####// needs trades, historical 1st
Routing - MECHANICAL5/13/2020 5/13/2020 PASS
DetailsTroy James
Resubmitted manual j report
BLD-Energy code compliance2/5/20202/6/20202/6/2020APASS
DetailsTony Young
Michael Phone #: ###-####
BLD-Framing/Rough-in2/3/20202/4/20202/4/2020PPART
DetailsTony Young
Michael Phone #: ###-####,, bracing ok after fixes,, ok to insulate,, fix truss repairs, insulate rim
BLD-Foundation12/10/201912/11/201912/11/2019APASS
DetailsDave Hannah
Grag Phone #: ###-####
BLD-Footing12/9/201912/9/201912/9/2019PPASS
DetailsTony Young
Greg Phone #: ###-####
Routing - MECHANICAL11/19/2019 11/19/2019 PASS
DetailsTroy James
Issue PAID IN FULL permit  10/31/2019 DONE
Routing - Addressing10/28/2019 10/30/2019 PASS
DetailsDoug Chausow
ADU Address: 1924 N Harrison Blvd
Routing - PUBLIC WORKS10/28/2019 10/30/2019 PASS
DetailsCandy A. Nichols
ADU CREDIT FOR DEMO
Permit Ready to Issue  10/30/2019 DONE
NEED
RP
Inspection Record Card- Bld  10/30/2019 DONE
Telephone call  10/30/2019 DONE
Spoke with Sara to inform her the permit is ready and what fees are due.
Route to Impact Fee Review10/28/201910/31/201910/29/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Route to Impact Fee Review10/28/201910/31/201910/28/2019 PASS
DetailsEric Bilimoria
Plan assigned to (JAB) Josh10/25/201910/25/201910/28/2019 PASS
DetailsJosh Bogle
10/31 remodel, paper
Routing - MECHANICAL10/25/2019 10/28/2019 PASS
DetailsTroy James
Mechanical is approved to be deferred. No review at this time.
Routing - PLAN CHECK10/28/2019 10/28/2019 PASS
DetailsJosh Bogle
1st review completed  10/28/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  10/28/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  10/28/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/28/2019 DONE
DetailsJosh Bogle
ESC yes - Energy yes
CHANGE STATUS TO (REV)  10/28/2019 DONE
Some routing was missed. Was supposed to be routed like a new home, existing building was demo and new one was rebuilt.
Routing Walk-In (Zoning)10/25/201910/25/201910/25/2019APASS
DetailsJeff Lowe
Routing Walk-In (BLD)10/25/201910/25/201910/25/2019APASS
DetailsJosh Bogle
took in for level two Review
Routing Walk-In (Zoning)10/22/201910/22/201910/22/2019AFAIL
DetailsJosh Bogle
no contact with applicant
Intake Approval  10/22/2019 PASS
CHANGE STATUS TO (PND)  10/22/2019 DONE
need rescheck
Application received 10/22/2019