Permit Information
Permit NumberBLD19-04217
StatusIssued
Name RYAN CONSTRUCTION CO INC
Site Address 880 S RIVER Unit: 100
Project NameSupreme Lending-880 River, LLC
Customer Number 
ePlanReviewYes
Description
(SUPREME LENDING – 880 RIVER, LLC – 1ST STORY – SOUTH END OF BUILDING) (DRH17-00213) To remodel an existing 1,532 square foot shell tenant space located on the 1st story of an existing building for a new office tenant. Work is to include interior nonbearing walls, a single-user toilet/shower room accessible to the disabled, a gypsum board ceiling above the new toilet/shower room, millwork, and finishes. Except for the toilet room, the ceiling will be open to the structure above. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection6/11/20206/15/20206/15/2020PFAIL
DetailsJim Page
Provide fire alarm modificaitons for audio visual device addition in new restroom, no device is placed, a permit is required for fire alarm modificaitons. Provide annual inspection for fire extinguisher as discussed.

screened // John Phone #: ###-####
BLD-Final6/10/20206/10/20206/10/2020PNR
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in2/3/20202/4/20202/4/2020APASS
DetailsDave Hannah
John Phone #: ###-####
Meeting  1/2/2020 DONE
Jeff Stipp the applicant informed us that Anderson Construction is no longer doing the work on this permit. Ryan Construction Co is doing the work and we have deleted the information from Anderson and added Ryan Construtions information.
Issue PAID IN FULL permit  1/2/2020 DONE
Print Occupancy Form  1/2/2020 DONE
Plan assigned to (CJW)10/31/201911/21/201912/11/2019 PASS
DetailsCarl Westfall
11/14/19 (L-3 - 15 days) (eplan - 17 sheets) 800 River LLC
PLANS/APPL TAKEN TO FRONT DESK  12/11/2019 DONE
Permit Ready to Issue  12/11/2019 DONE
ALL MET NEED-
GC
Revised Certificate of Value
1st review completed  12/4/2019 DONE
Routing - PLAN CHECK10/31/2019 12/4/2019 PASS
DetailsCarl Westfall
Issuance was delayed until 12-11-19 waiting for the tenant's name.
Routing - FIRE10/31/201910/31/201911/27/2019 PASS
DetailsMark Stumbaugh
11/21 880 River TI L3
Routing - MECHANICAL10/31/2019 11/4/2019 PASS
DetailsTroy James
Routing - Design Review10/31/2019 11/1/2019 PASS
DetailsKatelyn Menuge
New vents okay.
Routing - PUBLIC WORKS10/31/2019 11/1/2019 PASS
DetailsMorgan Webb
Routing - PLUMBING10/31/2019 10/31/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Routing - Addressing10/31/2019 10/31/2019 PASS
DetailsDoug Chausow
Suite 100, per Architect
Intake Approval  10/25/2019 PASS
Intake Approval  10/24/2019 FAIL
DetailsBrian McGowan
Please address or provide the following for your prescreen to be approved:
1. Letter for Site Specific Fire Flow
2. Door, window, hardware, finish schedule, ceiling notes are not on A101
3. Fire extinguishers are not shown on G001
4. Provide elevations for cabinets and fixtures showing ADA compliance.
Application received  10/22/2019 DONE
Application submitted via PDS Online on Oct 22 2019 1:20PM