Routing - PLAN CHECK | 7/17/2020 | | 8/12/2020 | | FAIL |
Josh Bogle
|
|
|
|
BLD-Conference | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | DONE |
Tell Riley
|
|
|
*Screened* Shawn Phone #: ###-####
|
Plan Reviewer's activity | | | 8/3/2020 | | DONE |
Brian McGowan
|
|
|
Virtual meeting with Shawn. Told him the proposed enclosing of the porch would need a stem wall and footing as per IRC to meet exterior wall requirements or engineering from an Idaho Licensed Engineer.
Other inquiries were concerniong cantilevering, etc. I could not accurately answer those questions without reviewing the original plans and the resubmitted plans.
I told him I would call and try to verify information rather than just review and send back for corrections if possible.
|
Routing - MECHANICAL | 7/21/2020 | | 7/27/2020 | | FAIL |
Troy James
|
|
|
Need manual S with the equipment performance data. Talked to applicant by phone
|
Plan Modification Accepted | | | 7/14/2020 | | DONE |
|
|
|
some modifications to the plans in relation to porches, balconies and an addition
Paper to ePlan modification
|
BLD-Conference | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | DONE |
Tell Riley
|
|
|
Would like confirmation on what we are framing is getting accomplished correctly. Phone #: ###-#### Inspection requested via web by Shawn Whitaker
|
Routing Walk-In (BLD) | 12/30/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Josh Bogle
|
|
|
discussed a possible plan modification
|
BLD-Framing/Rough-in | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PART |
Tell Riley
|
|
|
Shawn Phone #: ###-####//egress window basement//
|
BLD-Conference | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | DONE |
Tell Riley
|
|
|
Shawn Phone #: ###-####
|
Permit Ready to Issue | | | 10/24/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 10/24/2019 | | DONE |
|
|
|
Spoke with Shawn to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 10/24/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/23/2019 | | 10/23/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2019 | | DONE |
Josh Bogle
|
|
|
ESc no - Energy no
|
Routing Walk-In (BLD) | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/22/2019 | | 10/22/2019 | | FAIL |
Josh Bogle
|
|
|
lacked a few details
|
1st review completed | | | 10/22/2019 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/14/2020 | 7/14/2020 | | | |
Josh Bogle
|
|
|
07/20 Modification
|
Application received | | 10/22/2019 | | | |
|
|
|
|