BLD-Final | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Dave Hannah
|
|
|
Dustin Phone #: ###-####
|
FIRE-Final Inspection | 2/4/2020 | 2/5/2020 | 2/5/2020 | P | PASS |
Jim Page
|
|
|
Previously noted item for fire alarm correction complete, final life fire safety inspection for area of work complete, signatures provided on permit sign off card.
Justin Phone #: ###-####
|
BLD-Final | 1/31/2020 | 1/31/2020 | 2/3/2020 | P | PART |
Dave Hannah
|
|
|
Justin Phone #: ###-#### ok for tco ok for perm after fire gos perm
|
FIRE-Final Inspection | 1/31/2020 | 1/31/2020 | 1/31/2020 | P | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, a minor fire alarm modification was required, hotel fire panel is what provides notification to the fire alarms in area of work, fire alarm inspection for the 1 strobe addition will be completed on 05FEB2020. No fire sprinkler modifications, fire extinguishers are placed with current inspection tags. TCO authorized for 14 days per conversation with Joe Bruce, Fire Section Supervisor. After fire alarm inspection is inspected and finaled this permit can be signed off for life fire safety. Chest freezer will be relocated as discussed.
Justin Phone #: ###-####
|
BLD-Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | NR |
Dave Hannah
|
|
|
Justin - call in advance Phone #: ###-####
|
FIRE-Final Inspection | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | FAIL |
Jim Page
|
|
|
Provide fire alarm notification in waiter station area as discussed, any and all modifications to the fire alarm system will require a seperate permit. Relocate chest freezer that is blocking designated exit path from new kitchen opening into kitchen as discussed.
Justin - call in advance Phone #: ###-####
|
BLD-Framing/Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/13/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/13/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 12/11/2019 | 12/14/2019 | 12/12/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (JAR) | 11/14/2019 | 11/14/2019 | 12/11/2019 | | DONE |
Julie Romig
|
|
|
12/10 - L3 Yoi Tomo
|
Routing - PLAN CHECK | 11/14/2019 | | 12/11/2019 | | PASS |
Julie Romig
|
|
|
|
1st review completed | | | 12/11/2019 | | DONE |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/11/2019 | | DONE |
|
|
|
all met
Need GC
Need Revised Value
|
Routing - FIRE | 11/14/2019 | 11/14/2019 | 12/10/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Environmental | 11/15/2019 | | 11/18/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 11/14/2019 | | 11/18/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - Addressing | 11/14/2019 | | 11/15/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2019 | | 11/15/2019 | | PASS |
Morgan Webb
|
|
|
NO NEW CUSTOMER SERVICE AREA.
|
Routing - Design Review | 11/14/2019 | | 11/15/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLANNING | 11/14/2019 | | 11/14/2019 | | PASS |
David Moser
|
|
|
see czc19-00257
|
Intake Approval | | | 11/13/2019 | | PASS |
|
|
|
|
Intake Approval | | | 10/30/2019 | | FAIL |
Javier Guzman
|
|
|
For prescreen review provide and upload the following:
• The adjacent space is an existing M occupancy and with the new dinning assembly expansion change in M use requires a major T.I. 520 checklist (directed by Carl M), provide a completed 520 checklist and any other item requested from the 520 checklist, also checklist is not complete unless all information is filled out, all appropriate boxes are checked, and all plan page numbers are listed.
• Provide how any new interior wall are being braced top of wall
• Provide suspended acoustic ceiling details section
• Provide mechanical and plumbing engineered plans per checklist due to food service or provide a transcript between you and the department head mechanical and plumbing supervisor stating no engineered plans are required.
|
Application received | | | 10/23/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2019 4:14AM
|