Permit Information
Permit NumberBLD19-04229
StatusFinaled
Name GAMMILL CONSTRUCTION
Site Address 3104 N CRANE CREEK RD
Project NameMontgomery Addition
Customer Number 
ePlanReviewYes
Description
HILLSIDE - WUI - Permit for a remodel & 297sq' addition that adds Living Space by converting 162sq' at the garage (now 462sq') and taking 135sq' from an existing covered patio. Project includes work to the Kitchen, new finishes, doors, and windows throughout, and adds a Master Suite. At completion home is 4bd/2.5bth. Energy Code via Prescriptive. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/23/20207/23/20207/23/2020PPASS
DetailsTony Young
Tim - */Screened*/ Phone #: ###-####
DOC - Permit Finaled7/23/20207/23/20207/23/2020PPASS
DetailsTony Young
CHANGE STATUS TO (ISS)  7/23/2020 DONE
Changed back to Issued status, no reason it should be in REC status
BLD-Other4/27/20204/28/20204/28/2020APASS
DetailsDave Hannah
Drywall is up on outer soffit. Phone #: ###-#### Inspection requested via web by Timothy Gammill
BLD-Wall cover4/17/20204/20/20204/20/2020APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Timothy Gammill,, frame and energy ok to cover
BLD-Framing/Rough-in4/16/20204/17/20204/17/2020APASS
DetailsTony Young
Call Tim 30 minutes prior for access. Phone #: ###-#### Inspection requested via web by Timothy Gammill// ok to insulate
BLD-Framing/Rough-in4/14/20204/16/20204/16/2020APEND
DetailsTony Young
Call Tim 30 minutes prior for access. Phone #: ###-#### Inspection requested via web by Timothy Gammill// needs trades.. walk through conf., needs point load studs, seal pack,, justify roof venting.. ok to insulate after mech pass, will need soffit inspection
BLD-Foundation2/24/20202/25/20202/25/2020APART
DetailsTony Young
wall // Greg Phone #: ###-####
BLD-Footing2/21/20202/21/20202/21/2020PPART
DetailsTony Young
Greg Phone #: ###-####// addition footings work in progress,, ok
PubWorks Subgrade Approval2/21/20202/21/20202/21/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
Plan assigned to (JAB) Josh2/11/20202/11/20202/12/2020 PASS
DetailsJosh Bogle
sheet sizes being corrected by applicant
Plan Reviewer's activity  2/12/2020 DONE
DetailsJosh Bogle
redlines transferred to the new sheets
Permit Ready to Issue  2/12/2020 DONE
Issue PAID IN FULL permit  2/12/2020 DONE
Inspection Record Card- Bld  2/12/2020 DONE
Routing - PLAN CHECK2/11/2020 2/11/2020 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  2/11/2020 DONE
DetailsJosh Bogle
ESC no - Energy yes
Meeting  2/11/2020 DONE
Had to jump the project back to Josh as the applicant uploaded all of their drawings in 8.5x11.
Plan Reviewer's activity  2/7/2020 FAIL
DetailsJosh Bogle
e-mailed Tim/Mark - not failing in ePlan yet pending info from applicant
Routing PW Grading-Hillside12/4/2019 12/13/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Routing - PLAN CHECK12/4/2019 12/12/2019 FAIL
DetailsJosh Bogle
see e-mail to Tim
Routing - PLANNING12/4/2019 12/4/2019 PASS
DetailsSue Cummings
Routing - PUBLIC WORKS12/4/2019 12/4/2019 PASS
DetailsCandy A. Nichols
Routing - Erosion and Sediment12/4/2019 12/4/2019 PASS
DetailsMichael Zawacki
Recd Pcfee & Taken To Pln CK  12/4/2019 DONE
Routing Walk-In (BLD)11/8/201911/8/201911/8/2019AFAIL
DetailsJosh Bogle
project will still be completed on eplan. questions on requirments for structural
Routing - PLAN CHECK11/8/2019 11/8/2019 FAIL
DetailsJosh Bogle
1st review completed  11/8/2019 FAIL
DetailsJosh Bogle
Intake Approval  11/1/2019 FAIL
2nd Prescreen- 1. Yours drawings have been removed so that you may upload with the correct submittal standards naming ( please visit our website https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
2. When you uploaded your drawings individually, they did not uploaded to the correct size which causes the scale to be off.
3. The black box on your drawings that reads "NOT FOR REGULATORY APPROVAL, PERMITING, OR CONSTRUCTION" needs to be removed from every drawing.
4. Provide an ESC Narrative stamped by engineering.
5. The plans for the foundation for the addition need to be stamped by engineering.
6. Structure calculations need to be stamped by engineering.
Please See the Checklist for more detail on numbers 4-6
Application received 10/28/201910/28/2019 DONE
DetailsJudith Amador
Added task for report. JHB