BLD-Final | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tony Young
|
|
|
Tim - */Screened*/ Phone #: ###-####
|
DOC - Permit Finaled | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Tony Young
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/23/2020 | | DONE |
|
|
|
Changed back to Issued status, no reason it should be in REC status
|
BLD-Other | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Dave Hannah
|
|
|
Drywall is up on outer soffit. Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD-Wall cover | 4/17/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Timothy Gammill,, frame and energy ok to cover
|
BLD-Framing/Rough-in | 4/16/2020 | 4/17/2020 | 4/17/2020 | A | PASS |
Tony Young
|
|
|
Call Tim 30 minutes prior for access. Phone #: ###-#### Inspection requested via web by Timothy Gammill// ok to insulate
|
BLD-Framing/Rough-in | 4/14/2020 | 4/16/2020 | 4/16/2020 | A | PEND |
Tony Young
|
|
|
Call Tim 30 minutes prior for access. Phone #: ###-#### Inspection requested via web by Timothy Gammill// needs trades.. walk through conf., needs point load studs, seal pack,, justify roof venting.. ok to insulate after mech pass, will need soffit inspection
|
BLD-Foundation | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PART |
Tony Young
|
|
|
wall // Greg Phone #: ###-####
|
BLD-Footing | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PART |
Tony Young
|
|
|
Greg Phone #: ###-####// addition footings work in progress,, ok
|
PubWorks Subgrade Approval | 2/21/2020 | 2/21/2020 | 2/21/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Plan assigned to (JAB) Josh | 2/11/2020 | 2/11/2020 | 2/12/2020 | | PASS |
Josh Bogle
|
|
|
sheet sizes being corrected by applicant
|
Plan Reviewer's activity | | | 2/12/2020 | | DONE |
Josh Bogle
|
|
|
redlines transferred to the new sheets
|
Permit Ready to Issue | | | 2/12/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/12/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/11/2020 | | 2/11/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2020 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Meeting | | | 2/11/2020 | | DONE |
|
|
|
Had to jump the project back to Josh as the applicant uploaded all of their drawings in 8.5x11.
|
Plan Reviewer's activity | | | 2/7/2020 | | FAIL |
Josh Bogle
|
|
|
e-mailed Tim/Mark - not failing in ePlan yet pending info from applicant
|
Routing PW Grading-Hillside | 12/4/2019 | | 12/13/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing - PLAN CHECK | 12/4/2019 | | 12/12/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Tim
|
Routing - PLANNING | 12/4/2019 | | 12/4/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - PUBLIC WORKS | 12/4/2019 | | 12/4/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 12/4/2019 | | 12/4/2019 | | PASS |
Michael Zawacki
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/4/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | FAIL |
Josh Bogle
|
|
|
project will still be completed on eplan. questions on requirments for structural
|
Routing - PLAN CHECK | 11/8/2019 | | 11/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 11/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 11/1/2019 | | FAIL |
|
|
|
2nd Prescreen- 1. Yours drawings have been removed so that you may upload with the correct submittal standards naming ( please visit our website https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
2. When you uploaded your drawings individually, they did not uploaded to the correct size which causes the scale to be off.
3. The black box on your drawings that reads "NOT FOR REGULATORY APPROVAL, PERMITING, OR CONSTRUCTION" needs to be removed from every drawing.
4. Provide an ESC Narrative stamped by engineering.
5. The plans for the foundation for the addition need to be stamped by engineering.
6. Structure calculations need to be stamped by engineering.
Please See the Checklist for more detail on numbers 4-6
|
Application received | | 10/28/2019 | 10/28/2019 | | DONE |
Judith Amador
|
|
|
Added task for report. JHB
|