BLD-Final | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PASS |
Jim Storey
|
|
|
Building is inspected except exterior deck/stairs. Call with questions. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Jim Storey
|
|
|
building not occupied. Looking to get upstairs occupancy. Please call when on the way. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor lc issued . nate will call for stair #2
|
BLD-Energy code compliance | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
BLD-Framing/Rough-in | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Jim Storey
|
|
|
Please call when on the way. I will meet you there. Best access is off of Williams st. driveway. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor
|
Routing - MECHANICAL | 1/9/2020 | | 1/9/2020 | | PASS |
Troy James
|
|
|
Manual j report
|
BLD-Wall Bracing | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | FAIL |
Dave Hannah
|
|
|
Plans are located in the conduit tube in the garage by the stairs. Shear details on 2.0, 2.1 and 2.2. There is a page stapled on 2.2 from engineer showing the nailing pattern. Please call with questions. Thanks Phone #: ###-#### Inspection requested via web by Nathan Taylor bldg shear was stapled not nailed as per engineering need ok from enginer
|
BLD-Wall Bracing | 12/18/2019 | 12/19/2019 | 12/19/2019 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Nathan Taylor//need details and shear wall schedule onsite--plan pages refered to are not onsite//
|
BLD-Footing | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Jim Storey
|
|
|
Pat Phone #: ###-####
|
Routing Walk-In (BLD) | 11/13/2019 | 11/13/2019 | 11/13/2019 | A | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 11/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 11/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 11/13/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 11/13/2019 | | 11/13/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing Walk-In (Zoning) | 11/5/2019 | 11/5/2019 | 11/5/2019 | A | FAIL |
Josh Bogle
|
|
|
no contact with applicant
|
Routing Walk-In (Zoning) | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | FAIL |
Leon Letson
|
|
|
Zoning Certificate Required
|
Routing Walk-In (BLD) | 10/23/2019 | 10/23/2019 | 10/23/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/23/2019 | | 10/23/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 10/23/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 10/23/2019 | | | |
|
|
|
|