Second Notice | | 7/18/2020 | 8/10/2020 | | DONE |
|
|
|
mailed 8-14-2020
|
First Notice | | 6/27/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
Permanent Occupancy | | | 6/17/2020 | | DONE |
|
|
|
|
BLD-Final | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PASS |
Mike Jordan
|
|
|
screened / greg Phone #: ###-####. Ok for perm occ.
|
BLD-Conference | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 5/20/2020 | 5/20/2020 | 5/20/2020 | P | PART |
Mike Jordan
|
|
|
Ok for temp occ.
|
FIRE-Final Inspection | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Screened -gREG Phone #: ###-####
|
BLD-Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | P | NR |
Mike Jordan
|
|
|
Greg Phone #: ###-####
|
FIRE-Final Inspection | 5/18/2020 | 5/19/2020 | 5/19/2020 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled. screened // Greg Phone #: ###-####
|
BLD-Final | 5/18/2020 | 5/19/2020 | 5/19/2020 | P | NR |
Mike Jordan
|
|
|
Greg *screened* Phone #: ###-####. Needs mech final and fire alarm.
|
FIRE-Final Inspection | 5/15/2020 | 5/18/2020 | 5/18/2020 | P | FAIL |
Troy Cobbley
|
|
|
Need e project related fire alarm permit finaled and the exit signs repaired.
Dave *screened* Phone #: ###-#### or Greg ###-####
|
BLD-Ceiling Grid Inspection | 5/4/2020 | 5/7/2020 | 5/7/2020 | P | DONE |
Mike Jordan
|
|
|
Screened-Greg Phone #: ###-####
|
BLD-Framing/Rough-in | 3/31/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Mike Jordan
|
|
|
greg Phone #: ###-####. Interior steel stud framed walls and hardlid appear to be ok. Inspection conducted via on line.
|
Issue PAID IN FULL permit | | | 2/5/2020 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/5/2020 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/10/2019 | 12/31/2019 | 2/4/2020 | | PASS |
Carl Westfall
|
|
|
(1st done) 12/24/19 (L-3 - 15 days) (eplan - 18 sheets) SARMC (waiting for more info on the shower)
|
Routing - PLAN CHECK | 1/29/2020 | | 2/4/2020 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/4/2020 | | DONE |
|
|
|
NEED GC AND REV VALUE
|
Plan resubmittals received | | | 1/29/2020 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/16/2020 | 1/19/2020 | 1/17/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 1/16/2020 | | DONE |
|
|
|
|
1st review completed | | | 1/16/2020 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/10/2019 | | 1/16/2020 | | FAIL |
Carl Westfall
|
|
|
|
Routing - FIRE | 12/10/2019 | 12/10/2019 | 1/3/2020 | | PASS |
Erika Akin
|
|
|
No comments attached. Modifications to the existing automatic sprinkler system in this facility may be required for the improvements planned. The tenant improvement plans shall be reviewed by a licensed fire sprinkler contractor, to determine what, if any, modifications are necessary to maintain code compliance within the project area. The building plan set includes engineered fire alarm drawings, stamped by Thomas Scofield. These plan sheets have not been plan reviewed and are NOT approved for design or installation. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems.
|
Routing - PUBLIC WORKS | 12/10/2019 | | 12/17/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 12/12/2019 | | 12/12/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 12/10/2019 | | 12/11/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to mechanical engineer and the applicant.
|
Routing - PLUMBING | 12/10/2019 | | 12/11/2019 | | PASS |
Daryl Spivey
|
|
|
Provide thermostatic mixing valve on lav as required by ISPC 407.3
|
Routing - Addressing | 12/10/2019 | | 12/10/2019 | | PASS |
Doug Chausow
|
|
|
|
Plan Reviewer's activity | | | 12/4/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 12/4/2019 | | PASS |
|
|
|
|
Application received | | | 10/28/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 28 2019 1:51PM
|
Third Notice | | 8/15/2020 | | | |
|
|
|
|