(CHILDREN’S THERAPY PLACE – THERAPY SWIMMING POOL – 1ST STORY) The fire sprinkler system is used for fire flow and to substitute for 1-hr corridors. To install a 15 foot by 15 foot in ground Class E therapy swimming pool (225 square feet) within the 888 square foot therapy pool area on the 1st story of an existing two story building (77 square foot single user toilet/shower/locker room, 42 square foot pool mechanical room, 12 square foot storage room, and 736 square foot pool room). This building, including a concrete pool “vault”, was constructed under permit BLD19-02464. The pool will maintain a temperature between 85 and 88 degrees. The therapy swimming pool varies in depth. The pool will have an automatic pool cover and the pool is required to be accessible to the disabled. Work is to include reinforced shotcrete, concrete stairs, a handrail, electric pool heater, electric pool light, power safety cover, steel bonding and grounding, a circulation and filtration system, lifesaving equipment, etc. Special Inspection is required for shotcrete and for the lift anchor installation. The work is required to comply with the approved drawings, with the structural design, with the plan review report, with all applicable Idaho State statutes, and with all applicable codes and ordinances. The therapy pool is required to comply with the 2015 ISPSC (International Swimming Pool and Spa Code). **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/6/20207/7/20207/7/2020ACANC
DetailsMike Jordan
Brandon *screened* Phone #: ###-####. Will reschedule in conjuction with building final.
BLD-Foundation1/7/20201/8/20201/8/2020PPASS
DetailsMike Jordan
rebar // Brandon Phone #: ###-####
BLD-Foundation1/2/20201/3/20201/3/2020ADEFR
DetailsTell Riley
Brandon - rebar special inspection for ADA Phone #: ###-####//scope requires special inspection for the installation of the lift anchors//
Issue PAID IN FULL permit  12/19/2019 DONE
Print Occupancy Form  12/19/2019 DONE
Telephone call  12/19/2019 DONE
left message with Brandon asking for good email.
Plan assigned to (CJW)11/5/201911/12/201912/3/2019 PASS
DetailsCarl Westfall
(1st done) 11/07/19 (L-2 - 7 days) (eplan - 10 sheets) Childrens Therapy Place Pool
Routing - PLAN CHECK11/5/2019 12/3/2019 PASS
DetailsCarl Westfall
Approved per the plan review report
1st review completed  12/3/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  12/3/2019 DONE
Permit Ready to Issue  12/3/2019 DONE
Need
GC Form
Routing - MECHANICAL11/5/2019 11/13/2019 PASS
DetailsTroy James
No mechanical work with this permit.
Routing PW Drainage11/6/2019 11/7/2019 PASS
DetailsBrian Murphy
Routing PW Environmental11/6/2019 11/7/2019 PASS
DetailsRick Christenson
Routing - PUBLIC WORKS11/5/2019 11/6/2019 PASS
DetailsMorgan Webb
WEST BOISE SEWER DISTRICT.
Routing - PLUMBING11/5/2019 11/5/2019 PASS
DetailsDaryl Spivey
See redline notes. Per plan and ISPC.
Routing - Addressing11/5/2019 11/5/2019 PASS
DetailsDoug Chausow
Plan Reviewer's activity  10/30/2019 PASS
Plan intake review approved
Intake Approval  10/30/2019 PASS
Intake Approval  10/29/2019 FAIL
(10-29-19) Refer to the circled item in the plan intake checklist. Resolve that item as directed. CJW
Application received  10/28/2019 DONE
Application submitted via PDS Online on Oct 28 2019 2:41PM