Permit Information
Permit NumberBLD19-04301
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 100
Project NameUS ECOLOGY SUITE #100
Customer Number 
ePlanReviewYes
Description
(US ECOLOGY - US BANK BUILDING - SUITE #100) This building is fully fire sprinkled as it is a high rise. Permit to remodel an existing 4,195 sqft office space. Refer to BLD17-03001 for building history. Work to include: Demo portion of ACT ceiling, railing at egress door, select light fixtures, and portion of exterior glazing, construct new training room area, breakroom area, (2) offices, railing at egress door, and a new exterior door. Approval is contingent on adhering to the approved plans, notations, local codes, and ordinances. Interior finishes shall be in compliance with Ch. 8 of the 2015 IBC. This building is fully fire sprinkled. Any alterations or modifications to the buildings fire sprinkler or fire alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise fire department. **MDH**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/13/20205/7/2020 DONE
mailed 5-8-2020
First Notice 3/30/20204/3/2020 DONE
mailed 4-6-2020
BLD-Final3/18/20203/20/20203/20/2020APASS
DetailsDave Hannah
Larren Phone #: ###-####
Permanent Occupancy  3/20/2020 DONE
FIRE-Final Inspection3/11/20203/13/20203/13/2020APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complkete, fire extiguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete, signatures provided on permit sign off card.

Laren Phone #: ###-####
BLD-Framing/Rough-in1/21/20201/22/20201/22/2020APASS
DetailsDave Hannah
LAREN Phone #: ###-####
Issue PAID IN FULL permit  12/26/2019 DONE
Print Occupancy Form  12/26/2019 DONE
Plan assigned to (M_H)12/5/2019 12/18/2019 DONE
DetailsMichael Hanson
1st review completed - 12/17 #518 L2 ePlan - US ECOLOGY
Routing - PLAN CHECK12/18/2019 12/18/2019 FAIL
DetailsMichael Hanson
See changemark in ePlan regarding 2015 IECC compliance.
Routing - PLAN CHECK12/18/2019 12/18/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  12/18/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  12/18/2019 DONE
MET
Need GC
1st review completed  12/17/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK12/5/2019 12/17/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing - Addressing12/5/2019 12/6/2019 PASS
DetailsDoug Chausow
Suite 100 is correct.
Routing - Design Review12/5/2019 12/6/2019 PASS
DetailsKayCee Babb
Per CZC19-00295
Routing - PUBLIC WORKS12/5/2019 12/5/2019 PASS
DetailsMorgan Webb
CREDIT FOR DEMO. NO NEW FEES.
Routing - MECHANICAL12/5/2019 12/5/2019 PASS
DetailsTroy James
Intake Approval  12/4/2019 PASS
DetailsJavier Guzman
Intake Approval  11/21/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• 11/21/19 Previous request for door hardware type not addressed, your prescreen response letter states updated plan sheet A641 shows the type of door hardware but no such sheet A641 was uploaded.
Per checklist Provide and show type of door hardware
Intake Approval  10/30/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Per checklist Provide DR/Planning & Zoning letters of approval for the new exterior doors
• Per checklist Provide and show type of door hardware
• Per checklist provide a Lighting Compliance COMcheck signed & printed on the plans if new lighting is being installed
Application received  10/29/2019 DONE
Application submitted via PDS Online on Oct 29 2019 10:11AM