BLD-Energy code compliance | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PART |
Brandon Shaw
|
|
|
Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2020 | 5/7/2020 | 5/7/2020 | A | PART |
Brandon Shaw
|
|
|
Pending Engineering approval for header and opening in garage, interior shear wall...
|
BLD-Framing/Rough-in | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | FAIL |
Brandon Shaw
|
|
|
Addres to be readily visable... Provide truss Engineering... Provide revised Engineering for compromised shear wall, with beam calcs, see plans pg. 4... Per plans- beam and columns to be as per schedule, see plans... OK to insulate...
|
Routing - MECHANICAL | 4/7/2020 | | 4/7/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA report.
|
BLD-Wall Bracing | 3/24/2020 | 3/26/2020 | 3/26/2020 | A | PART |
Tell Riley
|
|
|
shear // Mark Phone #: ###-####//nailing ok--need to add hot dip galvanized at PT plate//blocking ok//need to add hold downs/bolts--provide engineers alternative for the bolted holddowns in place of speced hold downs//ok to wrap if hot dip nails are visible for re-inspection//
|
BLD-Foundation | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 2/7/2020 | 2/10/2020 | 2/10/2020 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | NR |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 2/5/2020 | 2/5/2020 | 2/5/2020 | P | NR |
Brandon Shaw
|
|
|
Need Geo approval for soil subgrade at garage wall, west side...
|
Issue PAID IN FULL permit | | | 1/8/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/8/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 1/2/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 1/2/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 11/25/2019 | 11/25/2019 | 12/31/2019 | | PASS |
Josh Bogle
|
|
|
11/14 sfd L1 ePlan - 1st done
|
Routing - PLAN CHECK | 12/31/2019 | | 12/31/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2019 | | DONE |
Josh Bogle
|
|
|
|
Routing - FIRE | 12/10/2019 | 12/10/2019 | 12/19/2019 | | PASS |
Lee G Meredith
|
|
|
Resub SFH
Sprinklers wil not be required, since the contractor is installing a new fire hydrant on Boise Ave., across from the driveway entry.
|
Routing - PLAN CHECK | 12/18/2019 | | 12/18/2019 | | FAIL |
Josh Bogle
|
|
|
Garden Room appears to be Living Space and doesn't meet energy code or Fire Separation requirements
|
Routing - MECHANICAL | 12/18/2019 | | 12/18/2019 | | PASS |
Troy James
|
|
|
|
Plan Reviewer's activity | | | 12/10/2019 | | DONE |
Josh Bogle
|
|
|
accepted and routed resubmittals
|
Routing - PLANNING | 12/10/2019 | | 12/10/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - FIRE | 11/25/2019 | 11/25/2019 | 11/26/2019 | | FAIL |
Lee G Meredith
|
|
|
New SFH
11-26-19 emailed Mark Kolnes that fire apparatus and hydrant distance exceed maximum allowed and that fire sprinklers will be required.
|
1st review completed | | | 11/26/2019 | | FAIL |
Josh Bogle
|
|
|
|
Plan assigned to (RDP) | 11/1/2019 | 11/1/2019 | 11/25/2019 | | DEFR |
Rob Patrick
|
|
|
11/14 sfd L1 ePlan
|
Routing - PLAN CHECK | 11/1/2019 | | 11/25/2019 | | FAIL |
Rob Patrick
|
|
|
Man Room issues
|
Route to Impact Fee Review | 11/1/2019 | 11/4/2019 | 11/4/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 11/1/2019 | | 11/4/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 11/1/2019 | | 11/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/1/2019 | | 11/1/2019 | | CAN |
Candy A. Nichols
|
|
|
|
Routing - PLANNING | 11/1/2019 | | 11/1/2019 | | FAIL |
Sue Cummings
|
|
|
Dive on the "pole" section requires 5 ft. setback from property not using common drive. Diveway next to the house requires 3 ft, setback from property line.
|
Intake Approval | | | 11/1/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/1/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/1/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2019 | | FAIL |
|
|
|
All plans in the drawings folder must be uploaded in landscape format and be a minimum size of 24X18.
|
Application received | | | 10/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 30 2019 2:17PM
|