Permit Information
Permit NumberBLD19-04339
StatusIssued
Name BFH IDAHO LLC
Site Address 3415 W LASSEN ST
Project NameADU WAGNER GARAGE
Customer NumberCAA19-00210
ePlanReviewNo
Description
(CAA19-00210) PRESCRIPTIVE ENERGY CODE- Permit for the construction of an 840 sq ft (35'x24') detached Garage with an exterior staircase to a 603 sq ft ADU and 133 sq ft covered conc patio above as per the approved plans and any notations. R-1C zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in7/20/20207/21/20207/21/2020APART
DetailsTony Young
SCREENED // Scott Phone #: ###-####// frame portion ok,, owner will get permit to finish project
BLD-Conference6/25/20206/26/20206/26/2020APART
DetailsTony Young
Scott call ahead to met .... screened Phone #: ###-####// frame walk through,, need stairs/ handrail,, drainage on deck
BLD-Conference6/24/20206/25/20206/25/2020APART
DetailsTony Young
screened // Derek Phone #: ###-####// frame walk through,, needs stairs per code, hand rail.. will change permit to owner
Zoning Approval6/23/20206/23/20206/23/2020 PASS
DetailsKevin Holmes
BLD-Wall Bracing2/26/20202/27/20202/28/2020PPASS
DetailsDave Hannah
call 30 minutes ahead - jimmy Phone #: ###-####
BLD-Foundation1/6/20201/7/20201/7/2020PPASS
DetailsJim Storey
meghan - stem wall Phone #: ###-####
BLD-Footing1/2/20201/3/20201/3/2020APART
DetailsTony Young
Scott Phone #: ###-####,, footing for ADU
Plan assigned to (BJM)12/23/201912/23/20191/2/2020 DONE
DetailsBrian McGowan
01/03- 1st Review Complete- L1 ADU over Garage paper
Routing - PLAN CHECK12/31/2019 1/2/2020 PASS
DetailsBrian McGowan
Case Summary (BLD)  1/2/2020 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  1/2/2020 DONE
DetailsBrian McGowan
Permit Ready to Issue  1/2/2020 DONE
ALL MET
Need
RP
Telephone call  1/2/2020 DONE
Spoke with Scott to inform him the permit is ready, the fees due and taht we need a RP.
Meeting  1/2/2020 DONE
Fees paid - waiting for RP
Issue PAID IN FULL permit  1/2/2020 DONE
Plan resubmittals received  12/31/2019 DONE
2 copies of Sheet: ST, A-1, A-2, A-3, A-4, A-5 and EL
1st review completed  12/27/2019 FAIL
DetailsBrian McGowan
Routing - PLAN CHECK12/26/2019 12/27/2019 FAIL
DetailsBrian McGowan
Route to Impact Fee Review12/23/201912/27/201912/26/2019 PASS
DetailsTravis P Black
Route to Impact Fee Review12/23/201912/26/201912/26/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL  12/26/2019 PASS
DetailsTroy James
Mechanical ventilation will be verified at mechanical rough inspection.
Routing - PLANNING12/24/2019 12/24/2019 PASS
DetailsKevin Holmes
resubmittal redlines meets Planning conditions of approval
Routing - Addressing12/23/2019 12/24/2019 PASS
DetailsDoug Chausow
ADU Address: 3415 W Lassen Pl
Routing - PUBLIC WORKS12/23/2019 12/24/2019 PASS
DetailsCandy A. Nichols
ADU
CHANGE STATUS TO (ISS)  12/23/2019 DONE
Didn't want to do eplan, brough in plans for submittal
Plans ACCEPTED BY PLAN TECH  12/23/2019 DONE
Intake Approval  12/23/2019 PASS
Recd Pcfee & Taken To Pln CK  12/23/2019 DONE
VOIDED CHANGE STATUS  12/20/2019 DONE
this will be a 402 application- GC was informed
Intake Approval  11/4/2019 FAIL
After speaking with Scott, this building needs zoning approval on the full bath first. It could be considered an ADU and then zoning applications will need to be completed with them before the BLD can be applied for. Once everything is good to go with zoning we will then determine which application needs to be done for the Building side.
Application received  10/31/2019 DONE
Application submitted via PDS Online on Oct 31 2019 9:13AM