BLD-Final | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Tell Riley
|
|
|
Elaina- may go as early as possible Phone #: ###-####//life safety ok, shower complete//final finishes, flooring and trim work not complete at final//
|
DOC - Permit Finaled | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Framing/Rough-in | 12/31/2019 | 12/31/2019 | 12/31/2019 | A | PART |
Tell Riley
|
|
|
trades ok//walls covered prior to inspection//verified by photos from contractor while onsite//no structural changes//
|
BLD-Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | CANC |
Tell Riley
|
|
|
Elaniea Phone #: ###-####//needs framing//
|
Routing Walk-In (Zoning) | 10/31/2019 | 10/31/2019 | 10/31/2019 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 10/31/2019 | 10/31/2019 | 10/31/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/31/2019 | | 10/31/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 10/31/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/31/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 10/31/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/31/2019 | | DONE |
|
|
|
|
Application received | | 10/31/2019 | | | |
|
|
|
|