Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-04346
StatusFinaled
Name MELINDA ROMER
Site Address 1251 N COLE RD
Project NameFirst Rate Property Management
Customer Number 
ePlanReviewNo
Description
(FIRST RATE PROPERTY MANAGEMENT) Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 9,898 sq. ft (using exterior measurements) existing Office Tenant. This space was previously occupied by "Impact Directories" under BLD06-02223. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. An exit door was added during the remodel of BLD06-02223 that was not on the original plans. It is now shown on the plans and will be the Main Door for the Building. There will be no change to the occupancy. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/18/201912/19/201912/18/2019APASS
DetailsMike Jordan
Melinda- call for access Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection12/18/201912/18/201912/18/2019PPASS
DetailsMike Jordan
Melinda Phone #: ###-####. All issues have been resolved. Ok for perm occ.
Permanent Occupancy  12/18/2019 DONE
BLD-Final12/3/201912/4/201912/4/2019PNR
DetailsMike Jordan
call before to meet ; Melinda (alt# ###-####) Phone #: ###-####. fire/life/safety failed. Building will be ok when fire/life/safety issues have been resolved.
FIRE-Final Inspection12/3/201912/4/201912/4/2019AFAIL
DetailsMike Jordan
call before to meet ; Melinda (alt# ###-####) Phone #: ###-####. repair all eemrgency and exit lights/signs. Provide current anual inspection on all fir extinguishers. Note that the self illuminated exit signd are past the UL expiration date.
Issue PAID IN FULL permit  12/2/2019 DONE
Plan assigned to (BJM)10/31/201910/31/201911/27/2019 DONE
DetailsBrian McGowan
1st Review Complete- 528 Occupancy
Routing - PLAN CHECK11/27/2019 11/27/2019 PASS
DetailsBrian McGowan
Case Summary (BLD)  11/27/2019 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  11/27/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  11/27/2019 DONE
Print Occupancy Form  11/27/2019 DONE
Telephone call  11/27/2019 DONE
emailed (VM not set up on phone # provided) to let them know that the permit is ready for pick up.
Plan resubmittals received  11/19/2019 DONE
two copies each of A1.1 stamped and taken to plan reviewer.
Routing - PLAN CHECK10/31/2019 11/5/2019 FAIL
DetailsBrian McGowan
Could not find a matching floor plan to what she said is there. An exterior door has been added at some point which they want to use as their main door.
1st review completed  11/5/2019 FAIL
DetailsBrian McGowan
Plan Reviewer's activity  11/5/2019 DONE
DetailsBrian McGowan
Called Melinda to inform her she needs to do a 518 instead of the 528 application.
Routing - PUBLIC WORKS11/4/2019 11/4/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing - Addressing10/31/2019 11/1/2019 PASS
DetailsDoug Chausow
Plans ACCEPTED BY PLAN TECH  10/31/2019 DONE
Recd Pcfee & Taken To Pln CK  10/31/2019 DONE
Intake Approval  10/31/2019 PASS
First Notice 12/28/2019   
Application received 10/31/2019