BLD-Final | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Mike Jordan
|
|
|
Electrical was finaled this morning, looking to close out this permit as well. Phone #: ###-#### Inspection requested via web by Kevin Beals
|
DOC - Permit Finaled | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 11/15/2019 | 11/18/2019 | 11/18/2019 | A | CANC |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
BLD-Wall Bracing | 11/18/2019 | 11/18/2019 | 11/18/2019 | A | PASS |
Mike Jordan
|
|
|
Alan Phone #: ###-####
|
BLD-Framing/Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | FAIL |
Mike Jordan
|
|
|
Alan Phone #: ###-####. Fateners still overspaced, needs to fasten sheathing at blocking.
|
BLD-Framing/Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | FAIL |
Mike Jordan
|
|
|
Allen Phone #: ###-####. Provide hot dipped galvanized nails nails into sill plateat 6 inches on center. Missing fasteners and are overspaced. Missing nails on portal frame, header not long enough. See detail provided on approved plans. Correction notice posted.
|
BLD-Footing | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Mike Jordan
|
|
|
Brandon Phone #: ###-####
|
Plan assigned to (JAB) Josh | 10/31/2019 | 10/31/2019 | 11/5/2019 | | PASS |
Josh Bogle
|
|
|
11/06 garage, paper - 1st done
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 11/5/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/4/2019 | | 11/4/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/4/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/4/2019 | | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 11/1/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 10/31/2019 | | 11/1/2019 | | FAIL |
Josh Bogle
|
|
|
see e-mail to Idaho Wood Sheds
|
Routing Walk-In (Zoning) | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Karla Nelson
|
|
|
|
Routing Walk-In (BLD) | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Josh Bogle
|
|
|
plans taken in as a level two
|
Plans ACCEPTED BY PLAN TECH | | | 10/31/2019 | | DONE |
|
|
|
|
Intake Approval | | | 10/31/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/31/2019 | | DONE |
|
|
|
|
Application received | | 10/31/2019 | | | |
|
|
|
|