BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
Dave Hannah
|
|
|
Eric is the onsite contact Phone #: ###-#### Inspection requested via web by Josh Woodbeck
|
DOC - Permit Finaled | 7/23/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
Dave Hannah
|
|
|
|
Place hold on job | 6/2/2020 | | 7/21/2020 | | DONE |
Brittany Hill
|
|
|
no inpsection until signed permit is returned. not released in eplan
|
Print Statement | | | 7/21/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/21/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/7/2020 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/7/2020 | | DONE |
|
|
|
|
Telephone call | | | 5/7/2020 | | DONE |
|
|
|
SENT PERMIT TO reachus@bhico.com
|
Telephone call | | | 5/5/2020 | | DONE |
|
|
|
sent email to gc and applicant about expired permit
|
Expiration Notice | 4/13/2020 | 5/4/2020 | 4/13/2020 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 2/26/2020 | | DONE |
|
|
|
Informed Bill with Energy Management Corporation that we need the Project Value and the RCE/RCT number provided does not come up in the IBOL system
|
Plan assigned to (JG) | 12/5/2019 | 12/5/2019 | 12/10/2019 | | PASS |
Javier Guzman
|
|
|
12/10 L1 Verizon Generator Replacement ePlan
|
Routing - PLAN CHECK | 12/5/2019 | | 12/10/2019 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 12/10/2019 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/10/2019 | | DONE |
|
|
|
All Met
Need
GC Form
Revised Cert of Value
|
Routing - FIRE | 12/5/2019 | 12/5/2019 | 12/9/2019 | | PASS |
Erika Akin
|
|
|
No comments attached. Replacement of existing diesel generator. 300 gallon tank with containment.
|
Routing - PLANNING | 12/5/2019 | | 12/6/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Intake Approval | | | 12/4/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 11/13/2019 | | FAIL |
Michael Hanson
|
|
|
Resubmit the 11 x 17 construction drawings as 24 x 36 so they meet the minimum size and match the others already sized at 24 x 36.
|
Application received | | | 10/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2019 1:23PM
|