BLD-Conference | 6/5/2020 | 6/8/2020 | 6/8/2020 | P | DONE |
Brandon Shaw
|
|
|
Side and rear set backs are good, OK to cover/roof
|
BLD-Conference | 5/15/2020 | 5/18/2020 | 5/18/2020 | A | DEFR |
Brandon Shaw
|
|
|
Set backs on side yard have no been met... No new work appears to be done at this time, tarp on roof. Called Ralph, he is to schedule a conference this week...
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 11/12/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/12/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/1/2019 | | 11/1/2019 | | FAIL |
Josh Bogle
|
|
|
needs engineering for lateral, gravity
|
1st review completed | | | 11/1/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 11/1/2019 | | | |
|
|
|
|