Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-04367
StatusFinaled
Name REGEN PLLC
Site Address 801 N STILSON RD Unit: 100
Project NameRiverstone Family Health
Customer Number 
ePlanReviewYes
Description
(RIVERSTONE FAMILY HEALTH – SUITE #100) Permit is to remodel an existing 1,155 sq. ft. medical office tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing wall, removal of select door/door frame, removal of select millwork, construction of select interior non-bearing walls, select new door/door frames, select wall infill, select new restroom grab bars, new light fixtures, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/14/20208/11/2020 DONE
MAILED 8-14-2020 WITH FIRST LETTER
First Follow up  8/11/2020 DONE
Third Notice 5/12/20207/9/2020 DONE
mailed 7-9-2020
Third Notice 4/11/20205/7/2020 DONE
mailed 5-8-2020
Second Notice 3/15/20204/6/2020 DONE
mailed 4-6-2020
First Notice 2/9/20203/5/2020 DONE
mailed 3-6-20
BLD-Final1/30/20201/30/20201/30/2020APASS
DetailsDave Hannah
Please notify me 15 minutes prior to arrival to ensure I''m on site. Inspection requested via web by Justin Schwartz
FIRE-Final Inspection1/30/20201/30/20201/30/2020PPASS
DetailsJim Page
Previously noted items have been corrected, no fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete, signature provided on perit sign off card.

Justin ###-####
FIRE-Final Inspection1/30/20201/30/20201/30/2020ACANC
DetailsJim Page
Provide phone number for point of contact notification as requested in point of contact notes. Did not go to project site due to manpower issues, this request is canclled and inspection will need to be rescheduled with point of contact information.

Please notify me 15 minutes prior to arrival to ensure I''m on site. Inspection requested via web by Justin Schwartz
BLD-Final1/29/20201/29/20201/30/2020PFAIL
DetailsDave Hannah
Please call 15 min. prior to arrival so I can ensure I''m there. Inspection requested via web by Justin Schwartz needds fire finaled
Permanent Occupancy  1/30/2020 DONE
FIRE-Final Inspection1/29/20201/29/20201/29/2020PFAIL
DetailsTroy Cobbley
Mount the fire extinguisher as discussed and provide the correct Suite number. Plans say 100 tenant wants 300. Please call 15 min. prior to arrival so I can ensure I''m there. Inspection requested via web by Justin Schwartz
BLD-Framing/Rough-in12/26/201912/27/201912/27/2019APASS
DetailsTony Young
Please give me a 15-minute heads up so I can ensure that I''m on site.
Phone #: ###-#### Inspection requested via web by Justin Schwartz
BLD-Final12/10/201912/10/201912/10/2019PCANC
DetailsTell Riley
Duane Phone #: ###-####
Issue PAID IN FULL permit  12/4/2019 DONE
Print Occupancy Form  12/4/2019 DONE
Permit Ready to Issue  11/21/2019 DONE
ALL MET

Need
GC Form
Revised Cert of Value
Plan assigned to (JG)11/6/201911/6/201911/20/2019 PASS
DetailsJavier Guzman
11/22 2nd rev comp, 11/12 L1 Riverstone Family Health ePlan
Routing - PLAN CHECK11/18/2019 11/20/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/20/2019 DONE
Route to Impact Fee Review11/13/201911/16/201911/14/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  11/13/2019 DONE
DetailsJavier Guzman
Routing - PLAN CHECK11/6/2019 11/13/2019 FAIL
DetailsJavier Guzman
Routing PW Flood Plain11/6/2019 11/7/2019 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Intake Approval  11/6/2019 PASS
DetailsJavier Guzman
Routing - Addressing11/6/2019 11/6/2019 PASS
DetailsDoug Chausow
Suite 100
Routing - PUBLIC WORKS11/6/2019 11/6/2019 PASS
DetailsMorgan Webb
Intake Approval  11/4/2019 FAIL
DetailsJavier Guzman
For prescreen review provide and upload the following:
• Provide a lighting COMcheck based on the 2015 IECC, the uploaded lighting COMcheck show 2012 IECC, also sign and date the uploaded lighting COMcheck.
• Per checklist provide bracing method details of the top of new interior walls.
• Just an FYI, noticed break room sink height exceeds 34” per 2009 ICC A117 section 606.3
Application received  11/1/2019 DONE
Application submitted via PDS Online on Nov 1 2019 3:14PM
Third Notice 8/16/2020