BLD-Final | 1/20/2020 | 1/21/2020 | 1/22/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Brandon Shaw
|
|
|
|
Plan assigned to (JAB) Josh | 1/10/2020 | 1/10/2020 | 1/13/2020 | | PASS |
Josh Bogle
|
|
|
plan mod
|
Routing - PLAN CHECK | 1/10/2020 | | 1/13/2020 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2020 | | DONE |
Josh Bogle
|
|
|
min PR fee
|
Permit Ready to Issue | | | 1/13/2020 | | DONE |
|
|
|
**DO NOT RE-ISSUE - PLAN MOD**
|
CHANGE STATUS TO (ISS) | | | 1/13/2020 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 1/10/2020 | | DONE |
|
|
|
Hannah requested the workflow to be reopened for a plan mod to change the layout of the solar panels.
|
Routing - PLANNING | 1/10/2020 | | 1/10/2020 | | PASS |
Sue Cummings
|
|
|
Still good
|
BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | P | CANC |
Brandon Shaw
|
|
|
Jay Phone #: ###-####
|
BLD-Framing/Rough-in | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | CANC |
Tell Riley
|
|
|
Please call Brian Prussia with any questions or concerns at 208.241.5835 Phone #: ###-#### Inspection requested via web by BRS Permitting// No work needed to the existing roof structure per engineer’s roof evaluation.//
|
Issue PAID IN FULL permit | | | 11/15/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2019 | | DONE |
|
|
|
met
|
Plan assigned to (JAB) Josh | 11/4/2019 | 11/4/2019 | 11/13/2019 | | PASS |
Josh Bogle
|
|
|
11/08 PV, ePlan - 1st done
|
Routing - PLAN CHECK | 11/13/2019 | | 11/13/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLAN CHECK | 11/4/2019 | | 11/7/2019 | | FAIL |
Josh Bogle
|
|
|
fire access not dimensioned
|
1st review completed | | | 11/7/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLANNING | 11/4/2019 | | 11/5/2019 | | PASS |
Ethan Mansfield
|
|
|
|
Application received | | | 11/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 4 2019 12:00PM
|
Plans ACCEPTED BY PLAN TECH | | | 11/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/4/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/4/2019 | | DONE |
|
|
|
|