Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-04397
StatusIssued
Name ZAK CUTLER CONSTRUCTION
Site Address 2118 N HARRISON BLVD
Project NameMcKee Remodel
Customer Number 
ePlanReviewNo
Description
**PLAN MODIFICATION - no longer finishing basement. Will now be adding second story to house. Remodel to include: reconfiguring kitchen, reconfiguring master bath and bedroom, powder bath on main floor, gas fire place in living room. Second floor will include 2 bedrooms and 1 bath as well as family room. New front porch. JJN 03/10/20** Permit for a remodel, to include: reconfiguring master suite, half bathroom at stairs. Finishing basement, adding two bedrooms, bathroom and laundry area. Adding two new egress windows in basement bedrooms, replacing 12 windows in home, new roof also included in remodel, tearing off metal siding and repair the existing siding underneath. Replacing metal awning at front by extending roof over stoop. - All work per plans, notations, attachments, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance6/11/20206/11/20206/11/2020PPASS
DetailsTony Young
screened // Zach Phone #: ###-####
BLD-Framing/Rough-in6/4/20206/4/20206/4/2020PPASS
DetailsTony Young
Zak *screened* Phone #: ###-####
Fees Due Hold5/7/2020 5/20/2020 DONE
Details
Routing - MECHANICAL5/5/2020 5/6/2020 PASS
DetailsTroy James
Plan Modification Accepted  5/5/2020 DONE
New Manual J
CHANGE STATUS TO (ISS)  3/11/2020 DONE
Plan assigned to (J_N)2/24/20202/24/20203/10/2020 DONE
DetailsJenny Nelson
1st complete 02/28 plan mod - need more info for floodplain
Routing PW Flood Plain3/10/2020 3/10/2020 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####.
Routing - PLAN CHECK3/10/2020 3/10/2020 PASS
DetailsJenny Nelson
Case Summary (BLD)  3/10/2020 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  3/10/2020 DONE
DetailsJenny Nelson
Inspection Record Card- Bld  3/10/2020 DONE
DetailsJenny Nelson
Permit Ready to Issue  3/10/2020 DONE
DO NOT ISS- plan mod
Telephone call  3/10/2020 DONE
called GC to inform about plan mod fees and ready to pick up
Routing - PLAN CHECK2/24/2020 2/25/2020 FAIL
DetailsJenny Nelson
Need more information for floodplain review if new work can be done or not
Routing PW Flood Plain2/24/2020 2/25/2020 FAIL
DetailsJason C. Taylor
need market value and revised improvement values. JCT
Routing Walk-In (Zoning)2/24/20202/24/20202/24/2020PPASS
DetailsTed Vanegas
plan mod, originally to add a basment but now want add second store instead
Plan Reviewer's activity  2/24/2020 DONE
DetailsJenny Nelson
plan mod - no longer finishing basement - now adding second story. Routing to floodplain to make sure is still ok.
Routing Walk-In (BLD)2/7/20202/7/20202/7/2020PFAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)2/7/20202/7/20202/7/2020PPASS
DetailsDavid Moser
plan mod. DRH19-00424
Plan Modification Accepted  2/7/2020 DONE
Plan mod for roof
Routing - PLAN CHECK2/7/2020 2/7/2020 FAIL
DetailsJosh Bogle
plan lacked structural details, ACCA report, retaining wall engineering
Plan assigned to (J_N)11/5/201911/5/201911/8/2019 DONE
DetailsJenny Nelson
Routing - PLAN CHECK11/5/2019 11/8/2019 PASS
DetailsJenny Nelson
Inspection Record Card- Bld  11/8/2019 DONE
DetailsJenny Nelson
Case Summary (BLD)  11/8/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  11/8/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  11/8/2019 DONE
Issue PAID IN FULL permit  11/8/2019 DONE
Routing Walk-In (Zoning)11/5/201911/5/201911/5/2019PPASS
DetailsKatelyn Menuge
Extend roof over front door, reroof rest of roof, new windows to be fiberglass, repair existing cedar shake siding under the metal siding.
Routing Walk-In (BLD)11/5/201911/5/201911/5/2019PFAIL
DetailsJenny Nelson
Need to intake for floodplain
Routing PW Flood Plain11/5/2019 11/5/2019 PASS
DetailsJason C. Taylor
Project does not meet the Substantial Improvements section of Boise Floodplain Ordinance (B.C.C. 11-08). No floodplain requirements. If you have any questions, please call Jason Taylor at ###-####. (structure Value from Assessor = $240K)
1st review completed  11/5/2019 DONE
DetailsJenny Nelson
Application received 11/5/2019