BLD-Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting
|
DOC - Permit Finaled | 1/10/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Brandon Shaw
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/27/2019 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 12/17/2019 | 12/17/2019 | 12/26/2019 | | PASS |
Josh Bogle
|
|
|
plan mod
|
Routing - PLAN CHECK | 12/18/2019 | | 12/26/2019 | | PASS |
Josh Bogle
|
|
|
MINIMUM MOD FEE
|
Permit Ready to Issue | | | 12/26/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan Modification Accepted | | | 12/17/2019 | | DONE |
|
|
|
Hannah from Blue Raven requested a plan mod - as builts to change the layout of the solar panels
|
BLD-Framing/Rough-in | 12/2/2019 | 12/3/2019 | 12/3/2019 | A | CANC |
Brandon Shaw
|
|
|
No work needed to the existing roof structure per engineer’s roof evaluation.
|
Plan assigned to (JAB) Josh | 11/6/2019 | 11/6/2019 | 11/18/2019 | | PASS |
Josh Bogle
|
|
|
11/12 PV, ePlan - 1st done
|
Routing - PLAN CHECK | 11/18/2019 | | 11/18/2019 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 11/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/18/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/6/2019 | | 11/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 11/8/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | | 11/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2019 2:15PM
|
Plans ACCEPTED BY PLAN TECH | | | 11/6/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/6/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/6/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 11/6/2019 | | 11/6/2019 | | PASS |
Sue Cummings
|
|
|
|