BLD-Foundation | 6/26/2020 | 6/29/2020 | 6/29/2020 | A | DONE |
Tony Young
|
|
|
Randy *screened* Phone #: ###-####// retaining wall
|
PubWorks Subgrade Approval | 6/23/2020 | 6/23/2020 | 6/23/2020 | | DONE |
Jason C. Taylor
|
|
|
**NW Corner Retaining wall***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/19/2020 | 6/22/2020 | 6/22/2020 | P | PART |
Mike Jordan
|
|
|
Screened- Randy Phone #: ###-####. Work in progress on retaining, north west side.
|
BLD-Foundation | 6/1/2020 | 6/2/2020 | 6/2/2020 | P | PART |
Tony Young
|
|
|
Randy Phone #: ###-####,, work in progress
|
BLD-Footing | 5/27/2020 | 5/28/2020 | 5/28/2020 | P | PART |
Tony Young
|
|
|
Randy *screened* Phone #: ###-####.. west footings and south wall ok
|
PubWorks Subgrade Approval | 5/28/2020 | 5/28/2020 | 5/28/2020 | | DONE |
Jason C. Taylor
|
|
|
***WESTERN EXTERIOR FOOTINGS ONLY***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####// retaining wall footing in front
|
BLD-Foundation | 5/5/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PART |
Tony Young
|
|
|
*screened* Randy Phone #: ###-####,, upper tall foundation wall ok,, work in progress
|
BLD-Footing | 4/13/2020 | 4/14/2020 | 4/14/2020 | P | PART |
Tony Young
|
|
|
screened // Randy Phone #: ###-####// work in progress// ok
|
PubWorks Subgrade Approval | 4/9/2020 | 4/9/2020 | 4/9/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 2/14/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2020 | | DONE |
|
|
|
|
Telephone call | | | 2/11/2020 | | DONE |
|
|
|
emailed GC the fees
|
OVERRIDE | | | 1/30/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 12/10/2019 | 12/11/2019 | 1/30/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 1/30/2020 | | 1/30/2020 | | PASS |
Jenny Nelson
|
|
|
Per D_S review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/30/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 1/30/2020 | | DONE |
|
|
|
MET RANDYHEMMER@GMAIL.COM
Need
GC (GC listed on application is not in the system. need to confirm)
|
Routing PW Grading-Hillside | 1/27/2020 | | 1/27/2020 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing PW Grading-Hillside | 1/2/2020 | | 1/9/2020 | | FAIL |
Melissa Jannusch
|
|
|
No new grading plans submitted. Please see changemarks in ePlan
|
Routing - PLANNING | 1/2/2020 | | 1/3/2020 | | PASS |
Nicolette Womack
|
|
|
Approved as per plans submitted on 12-30-19.
|
Routing - PLAN CHECK | 1/2/2020 | | 1/2/2020 | | FAIL |
Jenny Nelson
|
|
|
Per D_S review
|
1st review completed | | | 12/23/2019 | | FAIL |
Debbie Sanine
|
|
|
|
Routing PW Grading-Hillside | 12/11/2019 | | 12/20/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Routing - PLANNING | 12/10/2019 | | 12/19/2019 | | FAIL |
Nicolette Womack
|
|
|
Site Plan does not match grading plan
|
Routing - MECHANICAL | 12/10/2019 | | 12/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 12/10/2019 | | 12/13/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required. Starting without prep inspection will result in double fee.
|
Route to Impact Fee Review | 12/11/2019 | 12/14/2019 | 12/12/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 12/10/2019 | | 12/12/2019 | | PASS |
Lee G Meredith
|
|
|
new SFH
Due to the structures size, fire apparatus distance, hydrant distance and amount of available fire flow at the hydrant, an NFPA 13D compliant fire sprinkler system will be required. Applicant notified via email with a copy of the review.
12-30-19: Resubmittal indicates on the site drawing that an NFPA 13D sprinkler system is to be provided.
|
Routing - PLAN CHECK | 12/10/2019 | | 12/12/2019 | | FAIL |
Debbie Sanine
|
|
|
Per D_S review
|
Routing - Addressing | 12/10/2019 | | 12/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 12/10/2019 | | 12/11/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/10/2019 | | |
|
|
|
|
Intake Approval | | | 12/10/2019 | | PASS |
|
|
|
|
Intake Approval | | | 11/14/2019 | | FAIL |
|
|
|
1/14/19 1st prescreen:
1. Please provide a Erosion and Sediment Control Plan and Narrative document or provide a SWPPP.
2. Please provide a Manual J.
3. Site Specific Fire Flow at Hydrants letter (From the public water provider).
4.FAIL: needs grading and drainage plan 10-23-2019, most recent site plans, addendum #1 from the geotechnical engineer.
-Melissa- Hillside
|
Application received | | | 11/8/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 8 2019 12:28PM
|