Permit Information
Permit NumberBLD19-04471
StatusIssued
Name LENAOLE LLC
Site Address 1013 S VISTA AVE
Project NameVista City Peanut - TI
Customer Number 
ePlanReviewNo
Description
(CITY PEANUT SHOP – TENANT IMPROVEMENT) This building does not have a fire sprinkler system. To remodel an existing 1,401 square foot tenant space to be used for nut roasting, nut frosting, popcorn popping, popcorn coating, etc. A 300 square foot retail sales area will be provided at the East entry. Access to the toilet room is not required for the public. Work is to include a new exhaust fan in an existing Class II hood, abandoning an existing toilet room, new roof top ductwork insulated to R-8 minimum, re-using the existing roof top HVAC unit, a new toilet room exhaust fan ducted to the outside, a grease trap, two convection ovens, new lighting, etc. Separate electrical, plumbing, and mechanical permits are required. Food processing operations that create grease laden vapors are not allowed. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in5/22/20205/26/20205/26/2020APASS
DetailsJim Storey
*screened* John Phone #: ###-####
BLD-Conference5/15/20205/15/20205/15/2020PPASS
DetailsJim Storey
John Phone #: ###-####
Issue PAID IN FULL permit  12/26/2019 DONE
Plan assigned to (CJW)11/8/201911/8/201912/10/2019 PASS
DetailsCarl Westfall
(1st done) 11/12/19 (L-1 - 3 days) (paper) Vista City Peanut (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  12/10/2019 DONE
Print Occupancy Form  12/10/2019 DONE
Permit Ready to Issue  12/10/2019 DONE
ALL MET
Need
GC Form (is tenant is acting as GC, we need a letter from the parcel owner allowing them to act as the GC)
Telephone call  12/10/2019 DONE
spoke with Dan and informed him what is needed to issue this permit, letter from parcel owner if Dan will be GC and revised ceritificate of value
Routing - PLUMBING12/9/2019 12/9/2019 PASS
DetailsDan Ediger
Per plans and ISPC
Plan resubmittals received  12/6/2019 DONE
Two copies of P-1 Sheets stamped and taken to plan reviewer.
Route to Impact Fee Review11/21/201911/24/201911/22/2019 PASS
DetailsTravis P Black
Review requested for Commercial Permit
1st review completed  11/20/2019 DONE
Routing - MECHANICAL11/14/2019 11/20/2019 PASS
DetailsTroy James
Routing - PLUMBING11/20/2019 11/20/2019 FAIL
DetailsDan Ediger
Indirect Waste is required on the Grease Trap.
Routing - PUBLIC WORKS11/13/2019 11/14/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing PW Environmental11/14/2019 11/14/2019 PASS
DetailsRick Christenson
Routing - PLAN CHECK11/8/2019 11/13/2019 PASS
DetailsCarl Westfall
Plans ACCEPTED BY PLAN TECH  11/8/2019 DONE
Intake Approval  11/8/2019 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  11/8/2019 DONE
Application received 11/8/2019