BLD-Final | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | NR |
Tony Young
|
|
|
Kaylee */ In Occupied Residence, Virtual Inspection requested*/ Phone #: ###-####// need trades and zoning 1st
|
BLD-Energy code compliance | 7/13/2020 | 7/13/2020 | 7/13/2020 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### x541 Inspection requested via web by Kailee Poetsch/// wanted a frame inspection// ok to insulate.. verify seal pack and mech. pass on vent
|
BLD-Conference | 4/1/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Tony Young
|
|
|
Sheathing and framing inspection. Phone #: ###-#### Inspection requested via web by Kailee Poetsch,, ok to cover the exterior
|
BLD-Framing/Rough-in | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | NR |
Jim Storey
|
|
|
Kerry (didn''t leave phone number) Phone #: ###-####
|
BLD-Wall Bracing | 3/30/2020 | 3/30/2020 | 3/30/2020 | P | PASS |
Jim Storey
|
|
|
Kerry (didn''t leave phone number) Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 3/2/2020 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 2/6/2020 | 2/6/2020 | 2/24/2020 | | PASS |
Brian McGowan
|
|
|
06/12 modification, ePlan
|
Routing - PLAN CHECK | 2/24/2020 | | 2/24/2020 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 2/24/2020 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/24/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT REISSUE**
|
Telephone call | | | 2/24/2020 | | DONE |
|
|
|
spoke with Kalee and let her know that the permit is ready for pick up and what fees are due.
|
Routing - Design Review | 2/21/2020 | | 2/21/2020 | | PASS |
KayCee Babb
|
|
|
Per DRH19-00429, revised 2-20-20.
|
Routing - Design Review | 2/14/2020 | | 2/14/2020 | | FAIL |
KayCee Babb
|
|
|
Plans do not match those approved through DRH19-00429, including door and window changes, as well as significant roofline change. A Certificate of Appropriateness modification is required.
|
Plan Modification Accepted | | | 2/6/2020 | | DONE |
|
|
|
changing the roof line (two copies of plan sheets A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8 and A-9. taken to Josh)
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | P | PART |
Tony Young
|
|
|
Kaylee Phone #: ###-####,, frame ?s,, fix existing as needed
|
BLD-Foundation | 11/22/2019 | 11/25/2019 | 11/25/2019 | A | PASS |
Tony Young
|
|
|
Kalie Phone #: ###-####
|
BLD-Foundation | 11/21/2019 | 11/22/2019 | 11/22/2019 | A | PASS |
Tony Young
|
|
|
Kalie Phone #: ###-####
|
Routing Walk-In (BLD) | 11/14/2019 | 11/14/2019 | 11/14/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/14/2019 | | 11/14/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/14/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/14/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy yes
|
Permit Ready to Issue | | | 11/14/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/14/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 11/12/2019 | | 11/12/2019 | | FAIL |
Josh Bogle
|
|
|
plans lacked several details - we looked through the checklist
|
1st review completed | | | 11/12/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 11/12/2019 | | | |
|
|
|
|