Permit NumberBLD19-04495
StatusFinaled
Name SPARKS CONSTRUCTION LLC
Site Address 230 S STRAUGHAN AVE
Project NameAdams Residence - Roof Joists
Customer Number 
ePlanReviewYes
Description
(ADAMS RESIDENCE – ROOF JOIST STRENGTHENING) (4-13-20 PLAN MODIFICATION TO CHANGE THE SUPPORT AT EACH END OF THE STRENGTHENED ROOF JOISTS TO ACCOUNT FOR THE ACTUAL BEARING CONDITION. TIMBER LEDGERS WILL BE INSTALLED. THE EXISTING JOISTS WERE ALSO FOUND TO BE 11-7/8” DEEP INSTEAD OF 14”. THE WORK IS REQUIRED TO COMPLY WITH THE REVISED STRUCTURAL DESIGN AND ANALYSIS.) This building does not have a fire sprinkler system. This building is 2 stories tall. Each story has a floor area of about 930 square feet (1,860 square feet total building) and a total occupant load of 9. To strengthen four existing roof joists that became overloaded when three 2 foot by 5 foot skylights were installed prior to 2003 without a permit. Existing joists were cut with headers installed to transfer the load to adjacent joists which caused excessive deflection and water ponding on the roof. Work is to include removing ceiling gypsum board, removing the roof insulation between joists, installing 20 foot long structural steel C-channels with 2” x 12” wood spacers bolted to existing roof joists, installing 3” x 8” wood extensions bolted to existing roof joists to transfer loads to the existing bearing walls, re-installing roof insulation between joists, and installing ceiling gypsum board. Since the roof was not vented to the outside with cross ventilation for each joist space as required by the code in effect when this building was constructed, joist cavities shall be evaluated for excessive moisture, dry rot, mildew, and mold. Mitigation is required if evidence of excessive moisture is discovered. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The 1-hr property line walls are required to be maintained. This is a scope of work permit. This permit does not establish a Certificate of Occupancy. Existing occupancy is still valid. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20205/26/20205/26/2020APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Sparks
DOC - Permit Finaled5/26/20205/26/20205/26/2020PPASS
DetailsTony Young
BLD-Framing/Rough-in4/20/20204/21/20204/21/2020APASS
DetailsDave Hannah
Dave - will call inspector to determine if virtual inspection can be done. Phone #: ###-####
CHANGE STATUS TO (ISS)  4/14/2020 DONE
Route to Impact Fee Review4/10/20204/13/20204/13/2020 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Plan assigned to (CJW)4/10/20204/10/20204/13/2020 PASS
DetailsCarl Westfall
plan mod - Adam's residence - strengthen roof joist (waiting for permits desk)
Routing - PLAN CHECK4/10/2020 4/13/2020 PASS
DetailsCarl Westfall
1st plan mod plan intake review approved
Plan Reviewer's activity  4/13/2020 PASS
1st plan mod approved
Routing - PLAN CHECK4/13/2020 4/13/2020 PASS
DetailsCarl Westfall
Plan mod review approved
Permit Ready to Issue  4/13/2020 DONE
**PLAN MOD - DO NOT REISSUE**
Plan Modification Accepted  4/10/2020 DONE
Plan mod - modify engineering plan related to bearing point on beam supports
Issue PAID IN FULL permit  12/3/2019 DONE
Plan assigned to (CJW)11/12/201911/18/201911/20/2019 PASS
DetailsCarl Westfall
11/18/19 (L-1 - 3 days) (paper) Roof joist strengthing
Routing - PLAN CHECK11/12/2019 11/20/2019 PASS
DetailsCarl Westfall
1st review completed  11/20/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/20/2019 DONE
Inspection Record Card- Bld  11/20/2019 DONE
Permit Ready to Issue  11/20/2019 DONE
MET
Need GC Form
Telephone call  11/20/2019 DONE
Called and left a message for Dave letting him know that his permit is ready and what the fees are.
Plans ACCEPTED BY PLAN TECH  11/12/2019 DONE
Recd Pcfee & Taken To Pln CK  11/12/2019 DONE
Intake Approval  11/12/2019 PASS
Application received 11/12/2019