BLD-Conference | 6/9/2020 | 6/9/2020 | 6/9/2020 | P | DONE |
Tell Riley
|
|
|
Scott Phone #: ###-####//phone conference to confirm subgrade and ELE were passed for shell of pool to be completed//Scott advised that both of these inspections were completed prior to pouring the shell//rebar was looked at on last inspection--other approvals were needed//
|
PubWorks Subgrade Approval | 1/3/2020 | 1/3/2020 | 1/3/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Concrete | 12/31/2019 | 1/2/2020 | 1/2/2020 | A | NR |
Tell Riley
|
|
|
Call before insp. Scott Phone #: ###-####//needs mechanical and electrical permit//electrical inspection needed prior to pour//needs subgrade approval//used as conference//
|
Plan Reviewer's activity | | | 12/23/2019 | | |
|
|
|
Applicant reduced sq. footage of pool from 1200 to 1040 thereby reducing valuation from $78,000 to $67,600.
|
Issue PAID IN FULL permit | | | 12/23/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/19/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 11/12/2019 | 11/12/2019 | 11/19/2019 | | PASS |
Josh Bogle
|
|
|
11/18 pool, paper
|
Routing - PLAN CHECK | 11/12/2019 | | 11/19/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 11/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 11/19/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 11/19/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 11/19/2019 | | DONE |
|
|
|
MET- Need
GC Form
|
Routing - Erosion and Sediment | 11/14/2019 | | 11/15/2019 | | PASS |
Andy J. Long
|
|
|
Homeowner RP, ESC plan waiver approved.
|
Routing - PUBLIC WORKS | 11/14/2019 | | 11/14/2019 | | PASS |
Candy A. Nichols
|
|
|
WEST BOISE
|
Routing PW Grading-Hillside | 11/12/2019 | | 11/13/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable must be approved by Public Works prior to scheduling a concrete inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
|
Routing Walk-In (Zoning) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Josh Bogle
|
|
|
took in for level two review
|
Telephone call | | | 11/12/2019 | | DONE |
|
|
|
route to Melissa
|
Application received | | 11/12/2019 | | | |
|
|
|
|