Permit Information
Permit NumberBLD19-04509
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 6021 E FOXGROVE DR
Project Namelot 14 block 2 Harris North #3
Customer Number 
ePlanReviewYes
Description
**HILLSIDE** **W.U.I. FOOTHILLS ZONE A CLASS "A" ROOF AND NON-COMBUSTIBLE EXTERIOR SIDING REQUIRED** **PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3590 sq. ft., two story (first story 1887 sq. ft., second story 1703 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 583 sq. ft. of covered patio/porch and a 1077 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. JJN ***As noted on drawing A0.0-Cover, Sprinkelrs are requried and will be provided***LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/8/20205/8/20205/8/2020PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled5/8/20205/8/20205/8/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results5/8/20205/8/20205/8/2020PDONE
DetailsBrandon Shaw
ACH50- 3.85
PubWorks Occupancy Approval4/30/20204/30/20204/30/2020 DONE
DetailsMelissa Jannusch
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection has been received by Public Works Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

BLD-Energy code compliance2/19/20202/19/20202/19/2020PPASS
DetailsDave Hannah
20-minute Self-Closing door is on order. Will be installed before final Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in2/16/20202/18/20202/18/2020APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kyle Seick c/n posted ok to insulate
BLD-Other2/12/20202/12/20202/12/2020PPASS
DetailsBrandon Shaw
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Wall Bracing1/13/20201/14/20201/14/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Foundation12/20/201912/20/201912/20/2019PPASS
DetailsBrandon Shaw
1p please Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Footing12/19/201912/19/201912/19/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing12/17/201912/18/201912/18/2019AFAIL
DetailsBrandon Shaw
Soil and forms to be a min. temp of 35 F...
Blanket or heat and tent to proper temp...
PubWorks Subgrade Approval12/17/201912/17/201912/17/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  12/6/2019 DONE
Inspection Record Card- Bld  12/6/2019 DONE
Telephone call  12/6/2019 DONE
emailed permit to be signed to- kdavis@boisehunterhomes.com Release Eplan
OVERRIDE  12/2/2019  
Plan assigned to (J_N)11/18/201911/18/201912/2/2019 DONE
DetailsJenny Nelson
12/05 sfd L2 ePlan
Routing - PLAN CHECK11/18/2019 12/2/2019 PASS
DetailsJenny Nelson
1st review completed  12/2/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  12/2/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  12/2/2019 DONE
met
Routing PW Grading-Hillside11/18/2019 11/21/2019 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Route to Impact Fee Review11/18/201911/21/201911/19/2019 PASS
DetailsTravis P Black
Initial residential review of new SFD permits requested for now.
Routing - FIRE11/18/201911/18/201911/19/2019 PASS
DetailsLee G Meredith
As noted on drawing A0.0-Cover, Sprinklers are required and being perovided.
Routing - MECHANICAL11/18/2019 11/19/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING11/18/2019 11/19/2019 PASS
DetailsJeff Lowe
Routing - Addressing11/18/2019 11/18/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS11/18/2019 11/18/2019 PASS
DetailsCandy A. Nichols
Routing - Erosion and Sediment11/18/2019 11/18/2019 PASS
DetailsMichael Zawacki
Plans ACCEPTED BY PLAN TECH  11/18/2019 DONE
Intake Approval  11/18/2019 PASS
Recd Pcfee & Taken To Pln CK  11/18/2019 DONE
Application received  11/13/2019 DONE
Application submitted via PDS Online on Nov 13 2019 7:12AM