BLD-Final | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/8/2020 | 5/8/2020 | 5/8/2020 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.85
|
PubWorks Occupancy Approval | 4/30/2020 | 4/30/2020 | 4/30/2020 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Photos of the landscaping and a video of the drainage connection has been received by Public Works Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Dave Hannah
|
|
|
20-minute Self-Closing door is on order. Will be installed before final Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Framing/Rough-in | 2/16/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick c/n posted ok to insulate
|
BLD-Other | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PASS |
Brandon Shaw
|
|
|
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Wall Bracing | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Foundation | 12/20/2019 | 12/20/2019 | 12/20/2019 | P | PASS |
Brandon Shaw
|
|
|
1p please Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 12/19/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Brandon Shaw
|
|
|
Soil and forms to be a min. temp of 35 F... Blanket or heat and tent to proper temp...
|
PubWorks Subgrade Approval | 12/17/2019 | 12/17/2019 | 12/17/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 12/6/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2019 | | DONE |
|
|
|
|
Telephone call | | | 12/6/2019 | | DONE |
|
|
|
emailed permit to be signed to- kdavis@boisehunterhomes.com Release Eplan
|
OVERRIDE | | | 12/2/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/18/2019 | 11/18/2019 | 12/2/2019 | | DONE |
Jenny Nelson
|
|
|
12/05 sfd L2 ePlan
|
Routing - PLAN CHECK | 11/18/2019 | | 12/2/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 12/2/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 12/2/2019 | | DONE |
|
|
|
met
|
Routing PW Grading-Hillside | 11/18/2019 | | 11/21/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 11/18/2019 | 11/21/2019 | 11/19/2019 | | PASS |
Travis P Black
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 11/18/2019 | 11/18/2019 | 11/19/2019 | | PASS |
Lee G Meredith
|
|
|
As noted on drawing A0.0-Cover, Sprinklers are required and being perovided.
|
Routing - MECHANICAL | 11/18/2019 | | 11/19/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 11/18/2019 | | 11/19/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 11/18/2019 | | 11/18/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/18/2019 | | 11/18/2019 | | PASS |
Candy A. Nichols
|
|
|
|
Routing - Erosion and Sediment | 11/18/2019 | | 11/18/2019 | | PASS |
Michael Zawacki
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/18/2019 | | DONE |
|
|
|
|
Intake Approval | | | 11/18/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/18/2019 | | DONE |
|
|
|
|
Application received | | | 11/13/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2019 7:12AM
|